Back to bathroom remodel contractors
L & G Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Mar 2026
- Last 24 months
- 4 permits filed
61 permits since 2000: 46 completed, 3 in progress, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 23 completed, 2 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 554 Head St | 1.wall removal on the 2nd floor. 2. 2nd floor relocate kitchen and add new bathroom ground level to comply to nov #202545967.Details
1.wall removal on the 2nd floor. 2. 2nd floor relocate kitchen and add new bathroom ground level to comply to nov #202545967. | $10,000 |
| May 13, 2022 | Completed final sign-off Dec 2024 | 721 Huron Av | to comply with complaint # 202180726 & revision to no-plan pa#202107023721. 1/f: infill space under (e) sunroom. add 3 bedrooms, 2 baths, media room. relocate washer/dryer. 2/f: relocate interior stairs, kitchen, bath & bedroom. add offices, 2 baths & 3 skylights. replace all windows at rear & sidesDetails
to comply with complaint # 202180726 & revision to no-plan pa#202107023721. 1/f: infill space under (e) sunroom. add 3 bedrooms, 2 baths, media room. relocate washer/dryer. 2/f: relocate interior stairs, kitchen, bath & bedroom. add offices, 2 baths & 3 skylights. replace all windows at rear & sides | $200,000 |
| Mar 13, 2020 | Completed final sign-off Jul 2020 | 220 Teresita Bl | remodel ground floor to include 2 bedrooms, 2 baths, & family room. remodel 2nd floor to include relocate kitchen and add half bath.Details
remodel ground floor to include 2 bedrooms, 2 baths, & family room. remodel 2nd floor to include relocate kitchen and add half bath. | $80,000 |
| Sep 13, 2019 | Completed final sign-off Sep 2021 | 557 03rd Av | remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof.Details
remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof. | $150,000 |
| May 2, 2019 | Completed final sign-off Jan 2020 | 1626 25th Av | 1st fl - add 2.5 bathroom, entertainment, office & 1 bedroom; 2nd fl - turn dining room into kitchen; add 1 bedroom & 2 bathrooms & reconfigure (e) full bathDetails
1st fl - add 2.5 bathroom, entertainment, office & 1 bedroom; 2nd fl - turn dining room into kitchen; add 1 bedroom & 2 bathrooms & reconfigure (e) full bath | $50,000 |
| May 31, 2018 | Completed final sign-off Sep 2018 | 4414 Cabrillo St | kitchen remodel: remove & replace cabinets, sink, countertop, plumbing fixture and some counter recept. install new ceiling light. bathroom remodel: remove and replace bathtub, toilet, sink & fixture. replace bathroom fan, upgrade electrical. replace all ceiling fixtures. like for likeDetails
kitchen remodel: remove & replace cabinets, sink, countertop, plumbing fixture and some counter recept. install new ceiling light. bathroom remodel: remove and replace bathtub, toilet, sink & fixture. replace bathroom fan, upgrade electrical. replace all ceiling fixtures. like for like | $62,000 |
| Dec 20, 2017 | Completed final sign-off Jul 2018 | 1600 Ortega St | remodel extg bedroom and bathroom on ground floor. replace wood beam with steel beam and posts. new skylight on 2nd floor.Details
remodel extg bedroom and bathroom on ground floor. replace wood beam with steel beam and posts. new skylight on 2nd floor. | $40,000 |
| Jan 20, 2017 | Completed final sign-off Mar 2018 | 744 44th Av | remodel (e) bath & add new bath at 2nd flrDetails
remodel (e) bath & add new bath at 2nd flr | $20,000 |
| Mar 9, 2016 | Completed final sign-off May 2016 | 243 Avila St | bathroom remodel - remove and replace bathtub, vanity toilet, fan, fixture and both wall & floor tiles. n/a maher ord. 155-13Details
bathroom remodel - remove and replace bathtub, vanity toilet, fan, fixture and both wall & floor tiles. n/a maher ord. 155-13 | $11,000 |
| Apr 7, 2014 | Completed final sign-off Jul 2014 | 2050 24th Av | demo (e) bathroom and enlarge layout. install r-13 insulation in exterior wall where construction occurs. install framing for new storage room. install led lights or pin type flourscent only. install 5/8" type x at garage. new bedroom and full bathDetails
demo (e) bathroom and enlarge layout. install r-13 insulation in exterior wall where construction occurs. install framing for new storage room. install led lights or pin type flourscent only. install 5/8" type x at garage. new bedroom and full bath | $25,000 |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 530 Russia Av | convert powder room to a full bathroom, add storage room at ground floor. legalize (e) habitable space on 1st floorDetails
convert powder room to a full bathroom, add storage room at ground floor. legalize (e) habitable space on 1st floor | $12,000 |
| Sep 7, 2012 | Completed final sign-off Dec 2012 | 120 Laura St | add two bedrooms, one full bathroom, & half bathroom in garage, laundry room/storage room on ground floor.Details
add two bedrooms, one full bathroom, & half bathroom in garage, laundry room/storage room on ground floor. | $56,350 |
| Oct 4, 2011 | Expired or cancelled expired Sep 2019 | 1391 48th Av | 1 kitchen remodel. remove and replace new cabinet, sink, plumbing fixtures, counter top, appliances and upgrade electric. 1 full bathroom remodel. remove and replace shower stall toilet and sink. replace new floor tile, replace a bath fan. upgrade electric and add some receptacles, replaceDetails
1 kitchen remodel. remove and replace new cabinet, sink, plumbing fixtures, counter top, appliances and upgrade electric. 1 full bathroom remodel. remove and replace shower stall toilet and sink. replace new floor tile, replace a bath fan. upgrade electric and add some receptacles, replace | $38,000 |
| Sep 8, 2011 | Completed final sign-off Dec 2011 | 646 35th Av | to add 2 bed rooms, one half bathroom and laundry area on extg ground floor per plan.Details
to add 2 bed rooms, one half bathroom and laundry area on extg ground floor per plan. | $35,000 |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 68 Forest View Dr | alteration to extg 2nd floor. 1)enclose extg central light well and install new 4 skylights(flat)(21 sq ft). 2) remove extg bath room and rebuild new 2 full bath room. 3)relocate extg kitchen. 4)rewire.Details
alteration to extg 2nd floor. 1)enclose extg central light well and install new 4 skylights(flat)(21 sq ft). 2) remove extg bath room and rebuild new 2 full bath room. 3)relocate extg kitchen. 4)rewire. | $50,000 |
| Mar 23, 2011 | Completed final sign-off Jun 2011 | 68 Forest View Dr | 1st floor-add 2 bedrooms, 2 full bathrooms, 1 laundry room & 2 storage roomsDetails
1st floor-add 2 bedrooms, 2 full bathrooms, 1 laundry room & 2 storage rooms | $45,000 |
| Jul 14, 2010 | Completed final sign-off May 2011 | 833 Greenwich St | unit # 837 only: remodel 1/2 bathroom, remove existing tiles drywall, bathtub & sink. install new drywall, bathtub, sink & tiles (wall & floor).Details
unit # 837 only: remodel 1/2 bathroom, remove existing tiles drywall, bathtub & sink. install new drywall, bathtub, sink & tiles (wall & floor). | $4,500 |
| Jul 31, 2009 | Completed final sign-off Oct 2009 | 1516 11th Av | construct two new bedrooms and one new full bathroom on (e) ground floor. replace (e) furnace and (e) water heaterDetails
construct two new bedrooms and one new full bathroom on (e) ground floor. replace (e) furnace and (e) water heater | $25,000 |
| Jun 16, 2009 | Completed final sign-off Sep 2009 | 530 30th Av | comply w/ nov #200909765 legalize one family room on (e) ground floor & remove illegal rear deck on 2nd floor, enclose patio door to rear deck. add one full bathroom on 2nd floor storage area.Details
comply w/ nov #200909765 legalize one family room on (e) ground floor & remove illegal rear deck on 2nd floor, enclose patio door to rear deck. add one full bathroom on 2nd floor storage area. | $18,000 |
| Sep 29, 2008 | Expired or cancelled expired May 2017 | 254 10th Av | remodel (e) 2nd floor (254- 10th ave) ,no walls removed - remodel (e) kitchen, one full bathroom & one half bathroom; upgrade (e) electrical; provide r-13 insulation for exterior wall; replace (e) damage plaster with new 5/8" type "x' gyp bd.Details
remodel (e) 2nd floor (254- 10th ave) ,no walls removed - remodel (e) kitchen, one full bathroom & one half bathroom; upgrade (e) electrical; provide r-13 insulation for exterior wall; replace (e) damage plaster with new 5/8" type "x' gyp bd. | $70,000 |
| Aug 6, 2008 | Never finaled issued Aug 2008, no final | 1933 Lake St | work @ unit# 1933 only. remodel kitchen. remove & replace new cabinetry. counter top appliance, fixture, sink, upgrade electric & plumbing, add to ceiling lights, remodel 1 1/2 bathroom. remove & replace new bath tub. one shower stall. toilet & vanity replace new tile.Details
work @ unit# 1933 only. remodel kitchen. remove & replace new cabinetry. counter top appliance, fixture, sink, upgrade electric & plumbing, add to ceiling lights, remodel 1 1/2 bathroom. remove & replace new bath tub. one shower stall. toilet & vanity replace new tile. | $56,000 |
| Jul 25, 2008 | Completed final sign-off Nov 2008 | 1455 20th Av | construct one bedroom, one bathroom on ground floor.Details
construct one bedroom, one bathroom on ground floor. | $20,000 |
| May 13, 2008 | Never finaled issued May 2008, no final | 1933 Lake St | remodel kitchen. remove & replace cabinets, counter top. appliance, sink & fixture. install ceiling light. remodel 1 1/2 bathroom. remove & replace 1 bath tub. 1 shower stall. 1 toilet. vanity. replace tile & fixture. install new ceiling light. replace 1 central heater (gas). remove damage plasterDetails
remodel kitchen. remove & replace cabinets, counter top. appliance, sink & fixture. install ceiling light. remodel 1 1/2 bathroom. remove & replace 1 bath tub. 1 shower stall. 1 toilet. vanity. replace tile & fixture. install new ceiling light. replace 1 central heater (gas). remove damage plaster | $55,800 |
| Apr 29, 2008 | Completed final sign-off Mar 2009 | 1742 21st Av | add 2 bedrooms, 2 full bathrooms,1 storage and laundry area on (e) ground floor per planDetails
add 2 bedrooms, 2 full bathrooms,1 storage and laundry area on (e) ground floor per plan | $60,000 |
| Apr 1, 2008 | Completed final sign-off Dec 2008 | 1742 21st Av | fluorescent light or os in bath. 50% flourescent watt in kitchen. remodeled 2 full bathrooms and 1 kitchen. remove & replace tile. remove & replace tub and fixture. remove & replace cabinets and appliance. provide exhaust fans in bath. replace fixture.Details
fluorescent light or os in bath. 50% flourescent watt in kitchen. remodeled 2 full bathrooms and 1 kitchen. remove & replace tile. remove & replace tub and fixture. remove & replace cabinets and appliance. provide exhaust fans in bath. replace fixture. | $39,000 |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 1562 34th Av | 2 bedrooms, 2 full bathrooms & laundry area to be constructed at ground floor per plan.Details
2 bedrooms, 2 full bathrooms & laundry area to be constructed at ground floor per plan. | $35,000 |
| Mar 20, 2007 | Completed final sign-off Jun 2007 | 1842 26th Av | 2 new bedrooms, 1 full bathroom and laundry room to be constructed at groundfloor.Details
2 new bedrooms, 1 full bathroom and laundry room to be constructed at groundfloor. | $20,000 |