Back to bathroom remodel contractors
Kyle Gleason And Sons
- Based in
- Fairfax
- On San Francisco permits
- Nov 2019 to Sep 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 5 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 1 in progress, 1 expired or cancelled. Typically 215 days from filing to permit and 542 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 1380 Noe St | h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112Details
h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 | $300,000 |
| Apr 25, 2024 | Completed final sign-off May 2026 | 275 Downey St | interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer barDetails
interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer bar | $300,000 |
| Sep 1, 2020 | Expired or cancelled cancelled Jan 2026 | 2765 Filbert St | finish space for includes kitchen and bathDetails
finish space for includes kitchen and bath | $45,000 |