Back to bathroom remodel contractors
Kunkel Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Jun 2026
- Last 24 months
- 11 permits filed
55 permits since 2000: 37 completed, 11 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | Completed final sign-off Aug 2026 | 5196 Mission St | removal of (e) non bearing walls and (n) flooring, replace (e) doors and hardware at office. removal of door to bathroom for accessible access. no exterior workDetails
removal of (e) non bearing walls and (n) flooring, replace (e) doors and hardware at office. removal of door to bathroom for accessible access. no exterior work | $20,000 |
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 610 16th Av | 3/f: conversion of (e) 58sf offcie off primary bedroom to a full bathroom, includes plumbing and elctrical work.Details
3/f: conversion of (e) 58sf offcie off primary bedroom to a full bathroom, includes plumbing and elctrical work. | $35,000 |
| Feb 4, 2019 | Completed final sign-off May 2019 | 609 Diamond St | remodel bathroom in kind, no structural work.Details
remodel bathroom in kind, no structural work. | $10,000 |
| Apr 20, 2017 | Completed final sign-off Nov 2017 | 953 Valencia St | interior remodeling of kitchen and bath. no walls to be altered or removed.Details
interior remodeling of kitchen and bath. no walls to be altered or removed. | $25,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2017 | 610 16th Av | interior remoedling of bathroom in an existing single family dwelling. like for like.Details
interior remoedling of bathroom in an existing single family dwelling. like for like. | $10,000 |
| Jan 23, 2017 | Completed final sign-off Apr 2017 | 4522 19th St | interior remodeling of the kitchen and bath of an existing family dwelling.Details
interior remodeling of the kitchen and bath of an existing family dwelling. | $30,000 |
| Jun 18, 2014 | Completed final sign-off May 2016 | 3946 19th St | remodel kitchen and bathroom. add master bath at 2nd floor. add bath at 2nd floor. replace windows at breakfast room.Details
remodel kitchen and bathroom. add master bath at 2nd floor. add bath at 2nd floor. replace windows at breakfast room. | $50,000 |
| May 14, 2014 | Completed final sign-off Jun 2014 | 2299 Sacramento St | unit #19 - remodel bath, no change in lighting & no change in wall & opening layout.Details
unit #19 - remodel bath, no change in lighting & no change in wall & opening layout. | $5,000 |
| Feb 13, 2014 | Completed final sign-off May 2014 | 411 Banks St | re-fixture & refinish kitchen & bath. new kitchen cabinets, replace in kind.Details
re-fixture & refinish kitchen & bath. new kitchen cabinets, replace in kind. | $20,000 |
| May 17, 2013 | Completed final sign-off Jul 2013 | 3946 19th St | refixture and refinish kitchen and bath. new kitchen cabinets. repair forced air heating systsem. all in ground floor unit.Details
refixture and refinish kitchen and bath. new kitchen cabinets. repair forced air heating systsem. all in ground floor unit. | $20,000 |