Back to bathroom remodel contractors
Kum Lun Wong Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Apr 2009
- Last 24 months
- 0 permits filed
42 permits since 2000: 24 completed, 6 never finaled, 12 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2008 | Completed final sign-off Nov 2008 | 2889 24th St | space a: add bathroom for future retail tenant spaceDetails
space a: add bathroom for future retail tenant space | $5,000 |
| Jun 2, 2008 | Completed final sign-off Sep 2008 | 3240 17th St | remodel kitchen & bath, build one new bathroom on 1st floor. no structural work.Details
remodel kitchen & bath, build one new bathroom on 1st floor. no structural work. | $20,000 |
| Aug 29, 2006 | Completed final sign-off Sep 2006 | 291 27th Av | install handrailing in rear stairwell and install lighting. comply w/ cbc 1003.3.3.6, repair cabinet in kitchen, repair water damage walls in bathroom to comply with nov 200672468Details
install handrailing in rear stairwell and install lighting. comply w/ cbc 1003.3.3.6, repair cabinet in kitchen, repair water damage walls in bathroom to comply with nov 200672468 | $1,500 |
| Jan 31, 2006 | Completed final sign-off Apr 2006 | 554 27th Av | remodel kchn and bath in 2nd floor kchn relocate sink and stove to other side of kchn/bthrm install new tile and fixtures/demo extg shower stall and install toiletDetails
remodel kchn and bath in 2nd floor kchn relocate sink and stove to other side of kchn/bthrm install new tile and fixtures/demo extg shower stall and install toilet | $10,000 |
| Sep 29, 2005 | Completed final sign-off Feb 2006 | 1243 Pine St | replace 120 sf gypsum board on wall and ceiling in bathroom, replace existing tub and toilet with like kind. install 1 gfi in existing plug.Details
replace 120 sf gypsum board on wall and ceiling in bathroom, replace existing tub and toilet with like kind. install 1 gfi in existing plug. | $2,000 |
| Feb 6, 2001 | Completed final sign-off Oct 2001 | 117 Dellbrook Av | add a full bath & a family rm. at 1 stflr. per planDetails
add a full bath & a family rm. at 1 stflr. per plan | $15,000 |