Back to bathroom remodel contractors
Kukbo Design Usa Llc
- Based in
- Los Angeles
- On San Francisco permits
- Nov 2023 to Jan 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 211 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2023 | Completed final sign-off Feb 2025 | 300 Grant Av | 5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred)Details
5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred) | $1,200,000 |