Back to bathroom remodel contractors
Kubro Construction
- Based in
- San Jose
- On San Francisco permits
- May 2021 to May 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 240 days from filing to permit and 614 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2021 | Completed final sign-off Sep 2023 | 701 Brunswick St | adu (unit c) on 1st floor. change of use and occupancy from group r-3 two unit building to group r-2 3 unit building: include at 1st floor - 1) add one 3-fixture full bathroom, one kitchen.Details
adu (unit c) on 1st floor. change of use and occupancy from group r-3 two unit building to group r-2 3 unit building: include at 1st floor - 1) add one 3-fixture full bathroom, one kitchen. | $60,000 |