Kotas Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Jun 2026
- Last 24 months
- 1 permit filed
35 permits since 2000: 28 completed, 1 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 2 expired or cancelled. Typically 2 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2022 | Expired or cancelled expired Apr 2025 | 3755 20th St | interior renovation of a single family home. alteration include kitchen remodel, new main bedroom & bath configuration. new 3rd floor bathroom & laundry areas. no change to exterior. upgrade lighting & electrical with new radiant floor.Details
interior renovation of a single family home. alteration include kitchen remodel, new main bedroom & bath configuration. new 3rd floor bathroom & laundry areas. no change to exterior. upgrade lighting & electrical with new radiant floor. | $300,000 |
| Mar 9, 2021 | Completed final sign-off Jan 2022 | 100 Turquoise Wy | remodel of fixtures and finishes at lower floor small bathroom. no structural work. all electrical and plumbing work under separate permit.Details
remodel of fixtures and finishes at lower floor small bathroom. no structural work. all electrical and plumbing work under separate permit. | $25,000 |
| Aug 31, 2020 | Completed final sign-off Jan 2022 | 100 Turquoise Wy | remodel master + guest bathrooms. all new finishes. remove and replace existing sheet flooring at bedrooms and family room. all electrical + plumbing to be done under separate permits.Details
remodel master + guest bathrooms. all new finishes. remove and replace existing sheet flooring at bedrooms and family room. all electrical + plumbing to be done under separate permits. | $25,000 |
| Aug 26, 2020 | Completed final sign-off Mar 2022 | 100 Turquoise Wy | kitchen and bath renovation. (n) windows in kind, doors-insulation of floor joists + exterior walls. patch + paint. no facade work. no changes to envelope. no mep changes to plumbing locations.Details
kitchen and bath renovation. (n) windows in kind, doors-insulation of floor joists + exterior walls. patch + paint. no facade work. no changes to envelope. no mep changes to plumbing locations. | $80,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | revision to app#201905019403. revisions inlclude new skylight at roof, enlarged stair opening and new guardrail at extg stair, removal of extg posts on 3rd floor, and new framing for master bath shower.Details
revision to app#201905019403. revisions inlclude new skylight at roof, enlarged stair opening and new guardrail at extg stair, removal of extg posts on 3rd floor, and new framing for master bath shower. | $18,000 |
| May 1, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work.Details
residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work. | $75,000 |
| Apr 3, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | exploratory demo. demolition of interior finishes at bathrooms and kitchen and back bedroom & laundry. related to upcoming interior remodeling work. demo to investigate water intrusion suspected sub standard framing and insect infestation. no structural, electrical or plumbing work.Details
exploratory demo. demolition of interior finishes at bathrooms and kitchen and back bedroom & laundry. related to upcoming interior remodeling work. demo to investigate water intrusion suspected sub standard framing and insect infestation. no structural, electrical or plumbing work. | $5,000 |
| Aug 27, 2018 | Completed final sign-off Mar 2019 | 3644 Market St | no increase in conditioned or non-conditioned space. master and guest bath remodel, replacement window at lightwell, new skylights, new window at rear elevation. 1 additional bedroom at 3rd floor.Details
no increase in conditioned or non-conditioned space. master and guest bath remodel, replacement window at lightwell, new skylights, new window at rear elevation. 1 additional bedroom at 3rd floor. | $50,000 |
| Feb 6, 2018 | Expired or cancelled cancelled Jan 2022 | 130 Monterey Bl | 2 story infill addition between front & rear bldg (81 sq.ft.). roof alteration (not visible to street). convert basement storage to living space with 1 full bath (641 sf). install 2 exterior doors, 5 windows & 2 skylights, new foundations & slab on grade.Details
2 story infill addition between front & rear bldg (81 sq.ft.). roof alteration (not visible to street). convert basement storage to living space with 1 full bath (641 sf). install 2 exterior doors, 5 windows & 2 skylights, new foundations & slab on grade. | $275,000 |
| Jan 10, 2017 | Completed final sign-off Jan 2019 | 835 Castro St | demolish 22 sq ft portion of extg structure at property rear. replace vinyl siding at front and rear elevation. replace window in extg location with new wood windows. remodel kitchen and bathrooms.Details
demolish 22 sq ft portion of extg structure at property rear. replace vinyl siding at front and rear elevation. replace window in extg location with new wood windows. remodel kitchen and bathrooms. | $125,000 |
| Sep 25, 2014 | Completed final sign-off Dec 2014 | 259 Marietta Dr | remodel extg 1st floor bathroom and expand into garage.Details
remodel extg 1st floor bathroom and expand into garage. | $15,425 |
| Apr 23, 2013 | Completed final sign-off Dec 2013 | 1333 Jones St | replacement of all finishes at master and hall bathrooms. replacement of existing doors at hallway. re-configure bath and master bedroom closets to create new master closet. new crown moulding at living and bedrooms. new interior lighting. no work at kitchen, no exterior work.Details
replacement of all finishes at master and hall bathrooms. replacement of existing doors at hallway. re-configure bath and master bedroom closets to create new master closet. new crown moulding at living and bedrooms. new interior lighting. no work at kitchen, no exterior work. | $175,000 |
| Apr 10, 2012 | Completed final sign-off Jan 2014 | 2730 17th St | change of use 312 site permit submittal. interior remodel of 1 story warehouse to child care. remove 1 non add bathroom. add 2 child size toilets & ada toilet. remove 1 office lobby. add 1 office storage & kitchenette, infill new window & doors @ (e) openings in cmu block walls. voluntary additionDetails
change of use 312 site permit submittal. interior remodel of 1 story warehouse to child care. remove 1 non add bathroom. add 2 child size toilets & ada toilet. remove 1 office lobby. add 1 office storage & kitchenette, infill new window & doors @ (e) openings in cmu block walls. voluntary addition | $60,000 |
| Jan 7, 2010 | Completed final sign-off Mar 2010 | 379 Highland Av | first floor add a full bathroom, enlarge storage area into garage.Details
first floor add a full bathroom, enlarge storage area into garage. | $12,000 |
| Jan 6, 2010 | Completed final sign-off Dec 2010 | 117 Precita Av | #117 bath-repalce ns window in ew facing lightwell,infill of opening to be 1-hr, #119 bath-replace ns window in ew facing lightwell,infill of opening to be 1-hr;#119 kitchen sinkroom -replace ns window in ew facing lightwell,infill of opening to be 1-hr,windows not visable fr street,u-fac<0.40.Details
#117 bath-repalce ns window in ew facing lightwell,infill of opening to be 1-hr, #119 bath-replace ns window in ew facing lightwell,infill of opening to be 1-hr;#119 kitchen sinkroom -replace ns window in ew facing lightwell,infill of opening to be 1-hr,windows not visable fr street,u-fac<0.40. | $1,800 |
| Nov 10, 2009 | Completed final sign-off Dec 2010 | 117 Precita Av | 119-bath; replace tub, sink & toilet, wall tile & sheetrock & floor tile. 119-kitchen; replace sink & add dishwasher. 117-bath; replace tub, sink & toilet, wall tile & sheetrock & floor tile. (non-stuctural/in-kind).Details
119-bath; replace tub, sink & toilet, wall tile & sheetrock & floor tile. 119-kitchen; replace sink & add dishwasher. 117-bath; replace tub, sink & toilet, wall tile & sheetrock & floor tile. (non-stuctural/in-kind). | $22,500 |