Back to bathroom remodel contractors
Korbes Electric
- Based in
- San Mateo
- On San Francisco permits
- Dec 2001 to May 2018
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2017 | Expired or cancelled withdrawn Jun 2022 | 95 Leland Av | front bldg, upper floor- move existing wall (non bearing) between kitchen and bathroom.Details
front bldg, upper floor- move existing wall (non bearing) between kitchen and bathroom. | $200 |
| Jan 19, 2017 | Never finaled issued Feb 2017, no final | 95 Leland Av | remodel bathroom & kitchen, shower pan installation, new tiles, cabinets, floor @ unit 95.Details
remodel bathroom & kitchen, shower pan installation, new tiles, cabinets, floor @ unit 95. | $7,500 |
| Dec 7, 2015 | Expired or cancelled expired Jul 2018 | 570 London St | kitchen and bathroom remodel. new cabinets, electrical, new plmg, new kitchen window. remove one wall in kitchen.Details
kitchen and bathroom remodel. new cabinets, electrical, new plmg, new kitchen window. remove one wall in kitchen. | $35,000 |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 1471 15th St | replace kitchen counter-tile bathroom and install new vanity, unit 2 only, replace windows in kind bedroom windows will be rescue/egress compliantDetails
replace kitchen counter-tile bathroom and install new vanity, unit 2 only, replace windows in kind bedroom windows will be rescue/egress compliant | $2,800 |
| May 24, 2007 | Completed final sign-off Mar 2008 | 8 Jordan Av | remove old cabinets and open walls insections for new install , new ones. remove tiles swolls around bath tub walls. and bathroom floors install new tiles. unit#4, 5,9,12. 4 kitchen 2 bathrooms. no structural, no lighting changes. (e) to remain in bathroom fixtures.Details
remove old cabinets and open walls insections for new install , new ones. remove tiles swolls around bath tub walls. and bathroom floors install new tiles. unit#4, 5,9,12. 4 kitchen 2 bathrooms. no structural, no lighting changes. (e) to remain in bathroom fixtures. | $50,000 |
| Jan 7, 2004 | Completed final sign-off Apr 2004 | 616 Teresita Bl | add bedroom, laundry room & one bathroom and hallway on ground floorDetails
add bedroom, laundry room & one bathroom and hallway on ground floor | $40,000 |
| Dec 5, 2001 | Completed final sign-off Mar 2002 | 1690 Golden Gate Av | repair damaged sheetrock,broken glass windows,painting.remodel kit & bath etc.repair damaged doors,pDetails
repair damaged sheetrock,broken glass windows,painting.remodel kit & bath etc.repair damaged doors,p | $14,500 |