Back to bathroom remodel contractors
Kor Builders
- Based in
- Mill Valley
- On San Francisco permits
- Mar 2009 to Jan 2019
- Last 24 months
- 0 permits filed
23 permits since 2000: 10 completed, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 4 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2016 | Never finaled issued Apr 2016, no final | 35 Belgrave Av | demolition of interior walls, bath & kitchen fixtures, remove roof and exterior siding windows refer to site permit 201312275170; no structural work.Details
demolition of interior walls, bath & kitchen fixtures, remove roof and exterior siding windows refer to site permit 201312275170; no structural work. | $21,000 |
| Dec 2, 2014 | Never finaled issued Aug 2015, no final | 120 Retiro Wy | removal of (e) exterior deck @ rear (3rd flr) & (n) construction of bathroom to replace deck @ rear. replace (e) third floor windows. reference variance case 2014.1373v. attn: alexandra kirby (maher ordinance n/a.)Details
removal of (e) exterior deck @ rear (3rd flr) & (n) construction of bathroom to replace deck @ rear. replace (e) third floor windows. reference variance case 2014.1373v. attn: alexandra kirby (maher ordinance n/a.) | $15,000 |
| May 3, 2013 | Completed final sign-off Nov 2013 | 2472 California St | remove plaster, plumbing & electrical fixtures, exploratory kitchen, bath dining only.Details
remove plaster, plumbing & electrical fixtures, exploratory kitchen, bath dining only. | $1,100 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 72 Rossi Av | bath remodel- add new cabinet and fixtures, new tile shower, change light fixtures; lighting to comply with cec 150kDetails
bath remodel- add new cabinet and fixtures, new tile shower, change light fixtures; lighting to comply with cec 150k | $4,200 |
| Jul 22, 2010 | Expired or cancelled expired Oct 2020 | 82 Rossi Av | demolition & re-configuration of interior walls @ 1st flr/garage, 2nd & 3rd floor. new stair @ 1st & 2nd floor, new baths- complete interior remodel to be preformed @ 3rd floor, infill 3rd floor deck.Details
demolition & re-configuration of interior walls @ 1st flr/garage, 2nd & 3rd floor. new stair @ 1st & 2nd floor, new baths- complete interior remodel to be preformed @ 3rd floor, infill 3rd floor deck. | $282,000 |
| Aug 26, 2009 | Completed final sign-off Jun 2010 | 74 Eagle St | kitchen remodel. new cabinets, lights & fixtures. powder bath remodel. kitchen. replace cabinets & counter. 4 bathrooms total. replace plumbing fixtures and re-tile walls & floors.Details
kitchen remodel. new cabinets, lights & fixtures. powder bath remodel. kitchen. replace cabinets & counter. 4 bathrooms total. replace plumbing fixtures and re-tile walls & floors. | $145,000 |
| May 28, 2009 | Completed final sign-off Aug 2009 | 373 Lombard St | work @ unit# 402 only. bath remodel# 1. replace bath with shower, new tile & shower pan. bath remodel # 2. replace shower pan, new shoer pan & tile.Details
work @ unit# 402 only. bath remodel# 1. replace bath with shower, new tile & shower pan. bath remodel # 2. replace shower pan, new shoer pan & tile. | $27,000 |
| Mar 10, 2009 | Completed final sign-off Aug 2009 | 32 Grattan St | move wall and plumbing to allow for longer tub @ closet replace fixtuers, relocate electrical as required. bathroom remodel @ 2nd flr. wall to be moved is non bearing partition wall of close.Details
move wall and plumbing to allow for longer tub @ closet replace fixtuers, relocate electrical as required. bathroom remodel @ 2nd flr. wall to be moved is non bearing partition wall of close. | $40,000 |