Kopfmann Construction Inc
- Based in
- Menlo Park
- On San Francisco permits
- Jul 2001 to Jun 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2021 | Completed final sign-off Oct 2021 | 2031 29th Av | concrete patio, 6 foot wood fence on grade, pre-cast planterDetails
concrete patio, 6 foot wood fence on grade, pre-cast planter | $8,000 |
| Jul 11, 2017 | Completed final sign-off Dec 2020 | 72 Vernon St | 256 sq.ft. 2 story addition. new 2 bathrooms. preservation repair front walls. new stucco.Details
256 sq.ft. 2 story addition. new 2 bathrooms. preservation repair front walls. new stucco. | $75,000 |
| Sep 30, 2005 | Completed final sign-off Oct 2005 | 655 Beach St | remove existing lights&switches&replace togle wit wallsensor &switch combo controlled by a time clock&bypass timer swich for mep permit only.Details
remove existing lights&switches&replace togle wit wallsensor &switch combo controlled by a time clock&bypass timer swich for mep permit only. | $61,089 |
| Jun 9, 2005 | Completed final sign-off Nov 2005 | 655 Beach St | oti-1 4/f el, meDetails
oti-1 4/f el, me | $80,000 |
| Dec 22, 2004 | Completed final sign-off Nov 2005 | 655 Beach St | oti-1, 1st floor, el, me, sp.Details
oti-1, 1st floor, el, me, sp. | $50,000 |
| Apr 19, 2004 | Completed final sign-off Nov 2004 | 655 Beach St | replace f bar ceiling with new r bar ceiling.Details
replace f bar ceiling with new r bar ceiling. | $37,000 |
| Aug 14, 2003 | Completed final sign-off Feb 2004 | 655 Beach St | new window opening @ ground floor tenant spaceDetails
new window opening @ ground floor tenant space | $20,000 |
| Nov 1, 2002 | Completed final sign-off Jan 2003 | 500 Montgomery St | add one smoke detector to (e)system in the electrical closet;add one new strobe annunciator in basemDetails
add one smoke detector to (e)system in the electrical closet;add one new strobe annunciator in basem | $500 |
| Aug 29, 2002 | Completed final sign-off Aug 2003 | 655 Beach St | oti-1, 3rd fl elDetails
oti-1, 3rd fl el | $87,300 |
| Aug 21, 2002 | Completed final sign-off Jan 2003 | 500 Montgomery St | remodel existing per plans and outlet and tele no increase in office spaceDetails
remodel existing per plans and outlet and tele no increase in office space | |
| Aug 2, 2002 | Expired or cancelled expired Jan 2004 | 500 Montgomery St | remodify lighting as per drawing, outlets & tele.Details
remodify lighting as per drawing, outlets & tele. | $37,865 |
| Aug 2, 2002 | Completed final sign-off Aug 2003 | 655 Beach St | oti-1, 3rd fl, lt only.Details
oti-1, 3rd fl, lt only. | $71,300 |
| Apr 15, 2002 | Completed final sign-off Jan 2003 | 500 Montgomery St | t.i. on portion of 1/fl. and portion of bsmtDetails
t.i. on portion of 1/fl. and portion of bsmt | $250,000 |
| Oct 3, 2001 | Completed final sign-off Nov 2001 | 655 Beach St | replace exist duct to meet height, add 4 ton a/c in copy room for processing cooling. relocate existDetails
replace exist duct to meet height, add 4 ton a/c in copy room for processing cooling. relocate exist | $12,500 |
| Sep 28, 2001 | Completed final sign-off Nov 2001 | 655 Beach St | revision to 200107194056: to correct and legalize change of occupancy @ ground levelDetails
revision to 200107194056: to correct and legalize change of occupancy @ ground level | $500 |
| Jul 19, 2001 | Completed final sign-off Nov 2001 | 655 Beach St | oti-1, 1st floor-el, meDetails
oti-1, 1st floor-el, me | $48,650 |