Back to bathroom remodel contractors
Kokalis Construction
- Based in
- San Rafael
- On San Francisco permits
- Mar 2007 to Jul 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2007 | Never finaled issued Oct 2007, no final | 1151 Taylor St | work @ unit# 3ph only. remove tile shower curb. remove shower. replace bath door. install stand up tub. new tile. paint. finish work. level floor.Details
work @ unit# 3ph only. remove tile shower curb. remove shower. replace bath door. install stand up tub. new tile. paint. finish work. level floor. | $6,000 |