Back to bathroom remodel contractors
Kinney Construction
- Based in
- Pacifica
- On San Francisco permits
- Oct 2001 to Feb 2008
- Last 24 months
- 0 permits filed
58 permits since 2000: 37 completed, 3 never finaled, 18 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2007 | Completed final sign-off Apr 2008 | 525 10th Av | bathroom remodel. bathroom addition, laundry room, electrical & plumbing upgrade, interior fiished & carpentry. parrtial window replacement all owrk interior except window replacement.Details
bathroom remodel. bathroom addition, laundry room, electrical & plumbing upgrade, interior fiished & carpentry. parrtial window replacement all owrk interior except window replacement. | $160,000 |
| Dec 20, 2006 | Completed final sign-off Jul 2007 | 620 Buchanan St | remove (e) cabinets & appliances. patch sheetrock, bring electrical & plumbing to code, bath area, remove (e) fixtures. install new fixtures. tile floor & shower surround. install new cabinets in kitchen & new tile floor. 1 kitchen & 1 bath. non structural.Details
remove (e) cabinets & appliances. patch sheetrock, bring electrical & plumbing to code, bath area, remove (e) fixtures. install new fixtures. tile floor & shower surround. install new cabinets in kitchen & new tile floor. 1 kitchen & 1 bath. non structural. | $35,000 |
| Nov 2, 2005 | Completed final sign-off May 2006 | 340 Monticello St | add additional bedroom space. 72 sq. ft. relocate bathroom wall. remodel bathroom, new tile, shower vanity, toilet, new flooring in exercise room. (change from 1/2 bath to full bath)Details
add additional bedroom space. 72 sq. ft. relocate bathroom wall. remodel bathroom, new tile, shower vanity, toilet, new flooring in exercise room. (change from 1/2 bath to full bath) | $35,000 |
| Jun 10, 2005 | Expired or cancelled expired Feb 2006 | 3109 Buchanan St | kitchen remove and replace exist cabinets, install gfis to code. new appliances, lights, bath: removDetails
kitchen remove and replace exist cabinets, install gfis to code. new appliances, lights, bath: remov | $10,000 |
| Apr 4, 2005 | Completed final sign-off Jul 2005 | 144 Carnelian Wy | remove exist tub, toilet, vanity, carpet. build partition wall between master bath and vanity area,Details
remove exist tub, toilet, vanity, carpet. build partition wall between master bath and vanity area, | $20,000 |
| Feb 16, 2005 | Expired or cancelled expired Jul 2006 | 317 Parnassus Av | r/r cabs,appl,flooring,sliding patio door&window.bring elec to code.guest&master bath-r/r vanity....Details
r/r cabs,appl,flooring,sliding patio door&window.bring elec to code.guest&master bath-r/r vanity.... | $39,000 |
| Feb 16, 2005 | Completed final sign-off Oct 2005 | 3137 Gough St | master bath remove 911 fixturess, remove plaster. relocate toilet & vanity within (e) bathroom.instaDetails
master bath remove 911 fixturess, remove plaster. relocate toilet & vanity within (e) bathroom.insta | $21,000 |
| Aug 18, 2004 | Completed final sign-off Nov 2004 | 351 Buena Vista East Av | bath remodel remove exsiting th e fixtures install newe tub, toilet, vanity, mirror, tile tub ***Details
bath remodel remove exsiting th e fixtures install newe tub, toilet, vanity, mirror, tile tub *** | $14,000 |
| Aug 18, 2004 | Never finaled issued Aug 2004, no final | 1723 18th Av | bath remodel remove (e) plubing fixtures & floor & plaster install new tub, install new shower,***Details
bath remodel remove (e) plubing fixtures & floor & plaster install new tub, install new shower,*** | $12,000 |
| Oct 22, 2003 | Completed final sign-off Jun 2004 | 3701 Clement St | remove old bath fixture. remove plaster. install new, tub, pedestal sink & toilet. install new windDetails
remove old bath fixture. remove plaster. install new, tub, pedestal sink & toilet. install new wind | $7,000 |
| Mar 11, 2003 | Completed final sign-off Jul 2003 | 1073 Broadway | remove & replace,bath tub,vanity,toilet,install tile on tub surround floor,new sheetrock,install fanDetails
remove & replace,bath tub,vanity,toilet,install tile on tub surround floor,new sheetrock,install fan | $12,000 |
| Jul 29, 2002 | Completed final sign-off Jun 2003 | 314 Laurel St | remodel (e)kitchen & bathroom located on 2nd story. no change to floor plan.Details
remodel (e)kitchen & bathroom located on 2nd story. no change to floor plan. | $40,000 |
| Nov 14, 2001 | Expired or cancelled expired May 2002 | 1582 39th Av | repair drt in bath, cahnge tub, upgrade ele. in bathrmDetails
repair drt in bath, cahnge tub, upgrade ele. in bathrm | $8,000 |