Kingdom Minded Renovations Inc/ Dba King
- Based in
- Sonoma
- On San Francisco permits
- May 2022 to Jul 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2023 | Completed final sign-off Dec 2023 | 835 14th St | main bathroom remodel (50 sq t) change layout from tub to walk in curbless shower wall mounted double sink vanity add exhaust fan,fixtures to be replacced in kindDetails
main bathroom remodel (50 sq t) change layout from tub to walk in curbless shower wall mounted double sink vanity add exhaust fan,fixtures to be replacced in kind | $23,000 |
| Jan 23, 2023 | Never finaled issued Jan 2023, no final | 28 Sequoia Wy | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $22,176 |
| Oct 31, 2022 | Completed final sign-off May 2023 | 4241 25th St | unit 2: remodel (3) bathrooms - 1/2 bath, (2) full baths, in-kind. no structural/plubming/electrical changes.Details
unit 2: remodel (3) bathrooms - 1/2 bath, (2) full baths, in-kind. no structural/plubming/electrical changes. | $48,000 |
| May 5, 2022 | Never finaled issued Sep 2022, no final | 1459 Willard St | one 49 sq ft bathroom remodel on 3rd floor in-kind. no strucutral, no changes to walls or openings. replace existing with (n) curbed shower, toilets + vanity. all (n) fixtures & finishes.Details
one 49 sq ft bathroom remodel on 3rd floor in-kind. no strucutral, no changes to walls or openings. replace existing with (n) curbed shower, toilets + vanity. all (n) fixtures & finishes. | $14,500 |