Kiland Consturction
- Based in
- San Jose
- On San Francisco permits
- Jun 2019 to Jun 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 3 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2019 | Completed final sign-off Mar 2020 | 70 El Verano Wy | interior construction and remodel only. convert 1st flr bedrm to dining, relocating 1st flr bath, convert 1st flr din to play rm w/ storage. add wall to (e) nook to close off kitchen. open floor plan on 1st flr for larger open space. kitchen remodel. add sliding door at kitchen, enlarge rear deck,Details
interior construction and remodel only. convert 1st flr bedrm to dining, relocating 1st flr bath, convert 1st flr din to play rm w/ storage. add wall to (e) nook to close off kitchen. open floor plan on 1st flr for larger open space. kitchen remodel. add sliding door at kitchen, enlarge rear deck, | $60,000 |