Back to bathroom remodel contractors
Kieran Keaney Const
- Based in
- Petaluma
- On San Francisco permits
- Jul 2009 to Jun 2023
- Last 24 months
- 0 permits filed
31 permits since 2000: 13 completed, 13 never finaled, 5 expired or cancelled.
Of the 13 never-finaled permits, 4 are 3 to 5 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 2 never finaled. Typically 4 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2023 | Never finaled issued May 2023, no final | 2125 Anza St | remodel bath remove bath tub replace with walk in shower and tileDetails
remodel bath remove bath tub replace with walk in shower and tile | $20,000 |
| May 9, 2023 | Completed final sign-off Aug 2023 | 1444 Broadway | unit 7: remodel one kitchen and one bathroom. non structural.Details
unit 7: remodel one kitchen and one bathroom. non structural. | $80,000 |
| Dec 23, 2014 | Completed final sign-off Mar 2015 | 542 Duncan St | interior remodel of a bathroom to replace all fixtures, new plumbing and electrical fixtures, new tiling. all within in existing bathroom. no work outside the bathroom.Details
interior remodel of a bathroom to replace all fixtures, new plumbing and electrical fixtures, new tiling. all within in existing bathroom. no work outside the bathroom. | $20,000 |
| Apr 16, 2012 | Completed final sign-off May 2013 | 3223 20th St | interior remodel on 2nd fl only. construct new built in shelf in living room. convert e storage into new bath.Details
interior remodel on 2nd fl only. construct new built in shelf in living room. convert e storage into new bath. | $10,000 |
| Dec 14, 2011 | Completed final sign-off Sep 2012 | 3124 Gough St | interior remodel with elimination of lightwells on both side property lines. 2nd fl: remodel and enlarge kitchen, convert 1 bedroom into master bedroom. convert 1/2 bath into full bath. eliminate back stair to garage. minor structure modification where required.ground floor improvement.Details
interior remodel with elimination of lightwells on both side property lines. 2nd fl: remodel and enlarge kitchen, convert 1 bedroom into master bedroom. convert 1/2 bath into full bath. eliminate back stair to garage. minor structure modification where required.ground floor improvement. | $50,000 |
| Nov 10, 2011 | Completed final sign-off Oct 2012 | 1962 Greenwich St | rear bldg -1st flr: add plywood panel @ 1st int wall, (e) bedrm #2 & convert into dining area,change (e) playrm to (n) kitchen. 2nd flr:change living rm & kitchen to ma. bedrm, change bedrm & dining area to (n) study, change dining rm & bath to girl's bedrm suite, add 3 baths @ 2nd flr.Details
rear bldg -1st flr: add plywood panel @ 1st int wall, (e) bedrm #2 & convert into dining area,change (e) playrm to (n) kitchen. 2nd flr:change living rm & kitchen to ma. bedrm, change bedrm & dining area to (n) study, change dining rm & bath to girl's bedrm suite, add 3 baths @ 2nd flr. | $70,000 |
| Oct 17, 2011 | Completed final sign-off Nov 2012 | 1964 Greenwich St | interior remodel of 1964 california st.(upper flr. front bldg.) convert (e) br-2 into a master bedrooms; convert (e) dining area into br-2, convert (e) kitchen into office/study, include kitchen & dining area in the (e) living room; construct a (n) guest bathroom.Details
interior remodel of 1964 california st.(upper flr. front bldg.) convert (e) br-2 into a master bedrooms; convert (e) dining area into br-2, convert (e) kitchen into office/study, include kitchen & dining area in the (e) living room; construct a (n) guest bathroom. | $50,000 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 2356 15th Av | response to inspector correction notice 201047360 dated 5/18/10 to increase cost of construction by 50000. reconstruct rear deck and stairs. replace front stairs (dryrot) revision to 200909247587. remodel e bath on 2nd fl. relocate stairs, new layout for master bedroom and bath. add 1 skylight, wndwDetails
response to inspector correction notice 201047360 dated 5/18/10 to increase cost of construction by 50000. reconstruct rear deck and stairs. replace front stairs (dryrot) revision to 200909247587. remodel e bath on 2nd fl. relocate stairs, new layout for master bedroom and bath. add 1 skylight, wndw | $70,000 |
| Jul 24, 2009 | Completed final sign-off Feb 2010 | 1080 Chestnut St | interior remodel; remodel (e) bathrooms & kitchen with new fixtures and equipments. work includes, upgrades electrical, plumbing system and new fixtures. no structural changes.Details
interior remodel; remodel (e) bathrooms & kitchen with new fixtures and equipments. work includes, upgrades electrical, plumbing system and new fixtures. no structural changes. | $40,000 |