Back to bathroom remodel contractors
Keystone Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Oct 2017
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2013 | Completed final sign-off Sep 2013 | 1555 26th Av | legalize one bedroom, bathroom, powder room, laundry room & storage per plan.Details
legalize one bedroom, bathroom, powder room, laundry room & storage per plan. | $30,000 |
| Feb 28, 2012 | Completed final sign-off Aug 2012 | 65 Lucy St | add 2 bedroom at ground floor & 1 full bathroomDetails
add 2 bedroom at ground floor & 1 full bathroom | $16,000 |
| Oct 7, 2011 | Completed final sign-off Feb 2012 | 591 Monterey Bl | comply w/ complaint #200453658,#200454926,#200454928,#201030626,#201054855 remodel existing employee lounge rm and bath room at ground floorDetails
comply w/ complaint #200453658,#200454926,#200454928,#201030626,#201054855 remodel existing employee lounge rm and bath room at ground floor | $28,000 |
| Feb 24, 2009 | Completed final sign-off May 2009 | 1744 Bay St | comply with physical inspection report #cc-5487. to legalize (2) storage rooms & (1) 1/2 bath. deck footing & brace re-inforcement at rear deck.Details
comply with physical inspection report #cc-5487. to legalize (2) storage rooms & (1) 1/2 bath. deck footing & brace re-inforcement at rear deck. | $24,000 |
| Oct 3, 2008 | Completed final sign-off Jun 2009 | 41 Annapolis Tr | provide fluorescent light or manual on occupancy sensors in bathrooms. also exhaust fan w/bed. remodel 3 existing bathrooms, replace french doors required. one restroom on 3rd and one on 2nd floor. one restroom on 1st floor behind the garage. french doors on 1st level at rear in work shop area.Details
provide fluorescent light or manual on occupancy sensors in bathrooms. also exhaust fan w/bed. remodel 3 existing bathrooms, replace french doors required. one restroom on 3rd and one on 2nd floor. one restroom on 1st floor behind the garage. french doors on 1st level at rear in work shop area. | $45,000 |
| Sep 27, 2007 | Completed final sign-off Dec 2008 | 2526 Francisco St | site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck.Details
site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck. | $300,000 |
| Nov 13, 2006 | Completed final sign-off Jun 2007 | 1347 08th Av | remodel bathroom on top floor. new tub, toilet, shower, lights, tile, vanity. motion sensor manual on-light switche. no structural work.Details
remodel bathroom on top floor. new tub, toilet, shower, lights, tile, vanity. motion sensor manual on-light switche. no structural work. | $6,000 |
| Sep 29, 2006 | Never finaled issued Sep 2006, no final | 3033 Judah St | remodel 2 bathrooms, install the toilet lights & fixtrures, install light for brook stairway. anew outlesin hallway and room floor next for rainstain bathroom. one bathroom per unit total 2 bathroomsDetails
remodel 2 bathrooms, install the toilet lights & fixtrures, install light for brook stairway. anew outlesin hallway and room floor next for rainstain bathroom. one bathroom per unit total 2 bathrooms | $5,000 |
| Nov 2, 2005 | Completed final sign-off Mar 2006 | 2633 Turk Bl | remodel kitchen. bathrooms. replace 4 (e) windows. relocate skylight location.Details
remodel kitchen. bathrooms. replace 4 (e) windows. relocate skylight location. | $30,000 |
| Mar 15, 2005 | Completed final sign-off Sep 2005 | 1001 Pine St | replace (e) bathroom sink with new vanity, removal of oneDetails
replace (e) bathroom sink with new vanity, removal of one | $8,000 |