Back to bathroom remodel contractors
Kevin Fennelly Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to May 2018
- Last 24 months
- 0 permits filed
22 permits since 2000: 20 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 16 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2018 | Completed final sign-off Jul 2020 | 483 Marietta Dr | remodel of 1/f and front elevation improvements, includes remodeled family rm, laundry, office alcove, bath & new glass wall & entry door. at existing front courtyard. existing backyard exterior stairs refurbishment. new windows , except back patio doors/windows. new conditioned area from (e) garageDetails
remodel of 1/f and front elevation improvements, includes remodeled family rm, laundry, office alcove, bath & new glass wall & entry door. at existing front courtyard. existing backyard exterior stairs refurbishment. new windows , except back patio doors/windows. new conditioned area from (e) garage | $200,000 |
| Feb 9, 2016 | Completed final sign-off Nov 2016 | 787 Myra Wy | build new non bearing partitions, doors, closets. insulate new bedroom, bath. new door at rear. elec, plumbing as necessary to codeDetails
build new non bearing partitions, doors, closets. insulate new bedroom, bath. new door at rear. elec, plumbing as necessary to code | $20,000 |
| Aug 16, 2013 | Completed final sign-off Mar 2014 | 24 Ford St | (upper unit)interior remodel of 2 bedrooms, 1 bathroom, 1 kitchen, family room, living & laundry room. add 1 bathroomDetails
(upper unit)interior remodel of 2 bedrooms, 1 bathroom, 1 kitchen, family room, living & laundry room. add 1 bathroom | $40,000 |
| May 15, 2013 | Completed final sign-off Mar 2014 | 463 Hill St | remodel bathroom - replace vanity, toilet shower, shower valve & controls. add additional lightingDetails
remodel bathroom - replace vanity, toilet shower, shower valve & controls. add additional lighting | $15,000 |
| Feb 8, 2013 | Completed final sign-off May 2013 | 630 30th St | remodel kitchen & one bathroom change lighting to comply with cec 1505Details
remodel kitchen & one bathroom change lighting to comply with cec 1505 | $28,000 |
| Sep 17, 2012 | Completed final sign-off May 2013 | 1135 Monterey Bl | bearing wall removal, kitchen remodel, bathroom addition. replace windows in kind @ side of bldg. to verify in field.Details
bearing wall removal, kitchen remodel, bathroom addition. replace windows in kind @ side of bldg. to verify in field. | $40,000 |
| Jun 3, 2010 | Completed final sign-off Apr 2011 | 583 Teresita Bl | refinish (e) 1st/ garage floor and turn into master bedroom, master bath. create fire exit door out to backyard and install new window at rear.Details
refinish (e) 1st/ garage floor and turn into master bedroom, master bath. create fire exit door out to backyard and install new window at rear. | $75,000 |