Kevin Cooper Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Nov 2024
- Last 24 months
- 2 permits filed
32 permits since 2000: 30 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2012 | Completed final sign-off Sep 2012 | 1732 Ulloa St | replace front deck and railing. repair less than 50%, in-kind replacement, add vent over garage. replace two front windows (fiberglass over wood) in-kind with same size, same location.Details
replace front deck and railing. repair less than 50%, in-kind replacement, add vent over garage. replace two front windows (fiberglass over wood) in-kind with same size, same location. | $5,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 3620 Wawona St | to comply with nov #201148831 dated 7/14/11: repair rear deck & wall as necessary less than 50% in-kind. a pre-construction meeting with the contractor & building inspector is required prior to any repair work commenced, submit plans to dbi if the removal of deck & wall is more than 50% replacement.Details
to comply with nov #201148831 dated 7/14/11: repair rear deck & wall as necessary less than 50% in-kind. a pre-construction meeting with the contractor & building inspector is required prior to any repair work commenced, submit plans to dbi if the removal of deck & wall is more than 50% replacement. | $1,000 |