Kevel Home Performance
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Apr 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 138 16th Av | install (n) new roof-mounted split air-conditioning systems on existing forced air space conditioning system.Details
install (n) new roof-mounted split air-conditioning systems on existing forced air space conditioning system. | $12,000 |
| Sep 19, 2017 | Completed final sign-off Sep 2017 | 171 Andover St | replace (e) gravity furnace with high-efficiency unit in same garage location. asbestos remediation of (e) duct work. install new r-6 insulated 26 ga sheet metal system in garage (same location)Details
replace (e) gravity furnace with high-efficiency unit in same garage location. asbestos remediation of (e) duct work. install new r-6 insulated 26 ga sheet metal system in garage (same location) | $11,000 |