Back to bathroom remodel contractors
Kerry Mueller Design & Construction
- Based in
- Silver Springs
- On San Francisco permits
- Jun 2001 to Jul 2010
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2009 | Completed final sign-off May 2010 | 1656 Taylor St | unit #2 - remodel bathroom: change fixtures, new tile, tub, toilet. remodel kitchen: new cabinets, countertop, no wall changes.Details
unit #2 - remodel bathroom: change fixtures, new tile, tub, toilet. remodel kitchen: new cabinets, countertop, no wall changes. | $25,000 |
| Aug 27, 2009 | Completed final sign-off Jan 2010 | 2222 Clay St | work @ 3rd fl. bathroom remodel no structural changes, replace ex shower pan w/new, replace vanity, w.c. closet doors.Details
work @ 3rd fl. bathroom remodel no structural changes, replace ex shower pan w/new, replace vanity, w.c. closet doors. | $25,000 |
| Oct 17, 2007 | Completed final sign-off Jan 2008 | 1097 Green St | work on unit#6. (1) bathroom remodel: replace toilet & vanity w/new. replace tub w/walk-in shower. new tile on floor & wall. no wall changes.Details
work on unit#6. (1) bathroom remodel: replace toilet & vanity w/new. replace tub w/walk-in shower. new tile on floor & wall. no wall changes. | $10,000 |