Back to bathroom remodel contractors
Kendall S Miller Construction
- Based in
- Nampa
- On San Francisco permits
- May 2016 to May 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 132 days from filing to permit and 480 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2022 | Completed final sign-off Dec 2022 | 1896 Green St | 1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor.Details
1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor. | $35,000 |
| Mar 12, 2021 | Completed final sign-off Oct 2023 | 1738 Lake St | renovation of (e) family room, bathroom & new patio at backyard. lowering family room floor slab, electrical & plumbing.Details
renovation of (e) family room, bathroom & new patio at backyard. lowering family room floor slab, electrical & plumbing. | $150,000 |