Back to bathroom remodel contractors
Kenco Construction
- Based in
- Lafayette
- On San Francisco permits
- Sep 2012 to Apr 2018
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 never finaled. Typically 21 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2015 | Never finaled issued Dec 2015, no final | 53 Miguel St | change out 4 bathrooms, tubs, toilets, vanitys, floors, sinks, shower & tub walls, install new bath fans & lights, paint walls & ceilings, demo 2 old wood burning fireplaces.Details
change out 4 bathrooms, tubs, toilets, vanitys, floors, sinks, shower & tub walls, install new bath fans & lights, paint walls & ceilings, demo 2 old wood burning fireplaces. | $5,000 |
| Jun 25, 2014 | Never finaled issued Aug 2014, no final | 1830 38th Av | rebuild & replace all drywall, electrical system, plumbing supply lines, repaint, heating system. add bathroom downstair.Details
rebuild & replace all drywall, electrical system, plumbing supply lines, repaint, heating system. add bathroom downstair. | $40,000 |