Back to bathroom remodel contractors
Ken's General Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Jan 2025
- Last 24 months
- 1 permit filed
19 permits since 2000: 12 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 6 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2025 | In progress issued Oct 2025 | 915 Randolph St | comply w/ nov #201632281, 201893191 & planning 2018-008209enf: remove unpermitted deck & the in-filled under it, legalize front stairs (new orientation from last legal) new rear deck 180 sq ft, g/f remodel compliance & new adu per planning code 207.2 (2 bedroom, 2 bathroom 671 sq ft).Details
comply w/ nov #201632281, 201893191 & planning 2018-008209enf: remove unpermitted deck & the in-filled under it, legalize front stairs (new orientation from last legal) new rear deck 180 sq ft, g/f remodel compliance & new adu per planning code 207.2 (2 bedroom, 2 bathroom 671 sq ft). | $80,500 |
| Dec 17, 2021 | Completed final sign-off Jan 2022 | 301 Montecito Av | rev to pa 202106243179 and 201412234443 to relocate laundry, water heater and fau. bathroom remodel no changes to occupancy layouts nor unit counts. omit previous approved 2nd bath at ground flr. interior remodel non-structural work only.Details
rev to pa 202106243179 and 201412234443 to relocate laundry, water heater and fau. bathroom remodel no changes to occupancy layouts nor unit counts. omit previous approved 2nd bath at ground flr. interior remodel non-structural work only. | |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 301 Montecito Av | ground floor remodel 2 bedrooms 1 new full bathDetails
ground floor remodel 2 bedrooms 1 new full bath | $35,000 |
| Jan 25, 2012 | Completed final sign-off Jul 2012 | 2789 35th Av | garage remodel & rooms downstairs at rear of (e) building. add 1 bathroom, laundry, 1 bedroom & office rooms downstairs. voluntary wall strengthening & anchor bolting with connecting stairsDetails
garage remodel & rooms downstairs at rear of (e) building. add 1 bathroom, laundry, 1 bedroom & office rooms downstairs. voluntary wall strengthening & anchor bolting with connecting stairs | $37,000 |
| Sep 30, 2010 | Completed final sign-off Apr 2011 | 343 15th Av | interior removel of (e) 2 unit, 3 story residential bldg, interior remodel only. remodel (e) kitchen and baths. add 1 powder room in each unit per plan.Details
interior removel of (e) 2 unit, 3 story residential bldg, interior remodel only. remodel (e) kitchen and baths. add 1 powder room in each unit per plan. | $75,000 |
| Jun 23, 2010 | Completed final sign-off Oct 2010 | 1587 32nd Av | remodel (e) ground floor. install 2 bedrooms, 1 full bathroom and hallway at ground floorDetails
remodel (e) ground floor. install 2 bedrooms, 1 full bathroom and hallway at ground floor | $30,000 |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 7 Elizabeth St | one bathroom remodel with in kind, replace plumbing fixtures, retile floor & wall. no wall relocation & no structural changes, new lighting, work in unit #7a elizabeth stDetails
one bathroom remodel with in kind, replace plumbing fixtures, retile floor & wall. no wall relocation & no structural changes, new lighting, work in unit #7a elizabeth st | $3,000 |
| Apr 17, 2008 | Completed final sign-off Jun 2008 | 91 Cragmont Av | rear remodel @ g/f, no work on upper fl, remodel (e) media rm and add bathroom and window, change window to door @ rear of existing g/f.Details
rear remodel @ g/f, no work on upper fl, remodel (e) media rm and add bathroom and window, change window to door @ rear of existing g/f. | $10,000 |
| Mar 2, 2007 | Expired or cancelled expired Apr 2008 | 158 Laidley St | kitchen & bathroom remodel in all units (1-5). replace with like kind. no structural work.Details
kitchen & bathroom remodel in all units (1-5). replace with like kind. no structural work. | $50,000 |
| Mar 2, 2007 | Expired or cancelled expired Jun 2008 | 363 30th St | kitchen & bathroom remodel of upper & lower units. replace with like kind. no structural work.Details
kitchen & bathroom remodel of upper & lower units. replace with like kind. no structural work. | $22,000 |
| Jan 19, 2006 | Completed final sign-off Jan 2008 | 320 Ney St | 2 story horizontal rear addition: ground floor family room, 2 bedroom and full bath/2nd floor 2 bedroom and full bath.Details
2 story horizontal rear addition: ground floor family room, 2 bedroom and full bath/2nd floor 2 bedroom and full bath. | $80,000 |