Back to bathroom remodel contractors
Kelly And Son
- Based in
- Antioch
- On San Francisco permits
- Apr 2009 to Oct 2025
- Last 24 months
- 1 permit filed
55 permits since 2000: 39 completed, 1 in progress, 14 never finaled, 1 expired or cancelled.
Of the 14 never-finaled permits, 6 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 2 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2020 | Completed final sign-off Aug 2020 | 322 08th St | install fire sprinklers in each of 2 bathrooms, 1 at each location. total heads = 2. ref pa 201912270772. attach piping to rooster and lower pendent to cover new ceiling in bathroom.Details
install fire sprinklers in each of 2 bathrooms, 1 at each location. total heads = 2. ref pa 201912270772. attach piping to rooster and lower pendent to cover new ceiling in bathroom. | $1,050 |
| Oct 2, 2012 | Completed final sign-off Jan 2013 | 1273 Guerrero St | relocate (2) sprinkler heads and add (1) sprinkler head, bathroom remodelDetails
relocate (2) sprinkler heads and add (1) sprinkler head, bathroom remodel | $600 |
| Jul 27, 2011 | Never finaled issued Jul 2011, no final | 2140 Hyde St | #401 - remodel bathroom & kitchen: remove shower & replace with tile, add steam generator, install vanity & light fixtures, relocate 220 outlets, install bathroom window.Details
#401 - remodel bathroom & kitchen: remove shower & replace with tile, add steam generator, install vanity & light fixtures, relocate 220 outlets, install bathroom window. | $5,000 |