Back to bathroom remodel contractors
Keene Builders Inc
- Based in
- Berkeley
- On San Francisco permits
- Jun 2012 to May 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 6 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2018 | Completed final sign-off Mar 2019 | 47 Cityview Wy | replace (e) foundation in (e) location, finish & condition (e) 1st fl, add (1) bathroom, (1) family room, (1) playroom, (1) office in 1t fl. (n) heating system. replacing all windows in (e) openings, add (3) new windows at side of building.Details
replace (e) foundation in (e) location, finish & condition (e) 1st fl, add (1) bathroom, (1) family room, (1) playroom, (1) office in 1t fl. (n) heating system. replacing all windows in (e) openings, add (3) new windows at side of building. | $255,000 |
| Dec 23, 2015 | Completed final sign-off Jul 2016 | 47 Cityview Wy | walls reconfigured, master bath added, lanundry moved upstairs, deck with stairs off the master bedroom.Details
walls reconfigured, master bath added, lanundry moved upstairs, deck with stairs off the master bedroom. | $80,000 |
| Jul 16, 2013 | Completed final sign-off Apr 2014 | 20 Eagle St | revision to pa #2012.06.22.3211 - interior remodel of (e) bath & kitchen, no load-bearing walls affected.Details
revision to pa #2012.06.22.3211 - interior remodel of (e) bath & kitchen, no load-bearing walls affected. | $35,000 |
| Jun 18, 2013 | Completed final sign-off Jun 2014 | 2595 Clay St | kitchen remodel, interior only, no exterior work. new sub panel for kitchen circuits, new bathroom sinkDetails
kitchen remodel, interior only, no exterior work. new sub panel for kitchen circuits, new bathroom sink | $15,000 |