Back to bathroom remodel contractors
Keegan Contruction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Aug 2026
- Last 24 months
- 17 permits filed
292 permits since 2000: 254 completed, 4 in progress, 9 never finaled, 25 expired or cancelled.
Of the 9 never-finaled permits, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
74 bathroom remodel permits: 66 completed, 1 in progress, 2 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 218 Castenada Av | remodel (e) bathroom in kind . remove finishes. replace fixtures and fittings and new tile on walls and floors (e) ceiling to remain in place. (e) led to remain as isDetails
remodel (e) bathroom in kind . remove finishes. replace fixtures and fittings and new tile on walls and floors (e) ceiling to remain in place. (e) led to remain as is | $20,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Details
unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. | $38,000 |
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 338 28th St | unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall.Details
unit 2: remodel kitchen and bathroom. like for like. replace knob and tube wiring. remove plaster insulate and update electrical, intsall dry wall. | $100,000 |
| Jul 8, 2025 | Completed final sign-off Jul 2026 | 62 Miramar Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $10,561 |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 1749 Sanchez St | revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floorDetails
revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floor | |
| Dec 3, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405Details
remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405 | $330,000 |
| Nov 20, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | remodel 2 bathrooms in kindDetails
remodel 2 bathrooms in kind | $22,000 |
| Nov 20, 2024 | Expired or cancelled withdrawn Nov 2024 | 1749 Sanchez St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $22,000 |
| Mar 17, 2023 | Completed final sign-off Apr 2024 | 3841 25th St | new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade.Details
new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade. | $350,000 |
| Dec 7, 2022 | Completed final sign-off Apr 2024 | 3841 25th St | remodel one kitchen and two bathrooms. retile front stairsDetails
remodel one kitchen and two bathrooms. retile front stairs | $80,000 |
| Nov 15, 2022 | Completed final sign-off Aug 2023 | 2504 Pacific Av | remodel primary bedroom, bathroom and closetDetails
remodel primary bedroom, bathroom and closet | $75,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2023 | 2265 Broadway | for unit 1, 1 bathroom remodel - replace toilet, tub, and vanity. replace tile at bathroom -guest room. no wall or layout changes.Details
for unit 1, 1 bathroom remodel - replace toilet, tub, and vanity. replace tile at bathroom -guest room. no wall or layout changes. | $15,000 |
| Nov 4, 2021 | Completed final sign-off Aug 2022 | 34 Castle St | bathroom remodel to bathroom on 34 castle street; including new plumbing fixtures, tile, lighting. electrical upgrades as required. installation of new bathroom fan to 36 castle street. install handrail at left rear stairs (from backyard to garage).Details
bathroom remodel to bathroom on 34 castle street; including new plumbing fixtures, tile, lighting. electrical upgrades as required. installation of new bathroom fan to 36 castle street. install handrail at left rear stairs (from backyard to garage). | $10,000 |
| Nov 4, 2021 | Completed final sign-off Mar 2023 | 2265 Broadway | remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areasDetails
remodel of appartment: scope includes 1 bathroom remodel in kind, kitchen remodel including new appliances and cabinetry, new closet layout, relocation of 2 interior doors and 1 interior partition, installation of new washer and dryer. also electical upgrade in remodeled areas and selected areas | $40,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 1614 Castro St | remodel bath on top floor. replace vanity with new vanity. install new shower stall and toilet. re-tile bathroom lighst per cec 150.0 (k)Details
remodel bath on top floor. replace vanity with new vanity. install new shower stall and toilet. re-tile bathroom lighst per cec 150.0 (k) | $20,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 144 Fairmount St | bath remodel. leak repair, remove vanity from wall of master bath. replace pex piling for hot water in wall of master bath with copper pipe and reconnect to pex piding at ceioing level. reinstall vanity and retile wall- lights per cec 150.0 (k)Details
bath remodel. leak repair, remove vanity from wall of master bath. replace pex piling for hot water in wall of master bath with copper pipe and reconnect to pex piding at ceioing level. reinstall vanity and retile wall- lights per cec 150.0 (k) | $7,000 |
| Apr 14, 2021 | Completed final sign-off Oct 2025 | 235 28th St | 3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office.Details
3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office. | $500,000 |
| Jun 25, 2020 | Completed final sign-off Aug 2020 | 147 29th St | final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard.Details
final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard. | |
| Jun 11, 2020 | Completed final sign-off Jan 2021 | 1011 Church St | bathroom remodel including new tile, plumbing, & cabinetry. all work in kind and same location.Details
bathroom remodel including new tile, plumbing, & cabinetry. all work in kind and same location. | $15,000 |
| Jan 30, 2020 | Completed final sign-off Jul 2021 | 80 28th St | unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' eaDetails
unit 82: remodel kitchen and 2 baths in unit 82. new cabinets and countertops. 149 sqft kitchen. 2 bathrooms 5' x 8' ea | $45,000 |
| Nov 25, 2019 | Completed final sign-off Jul 2021 | 80 28th St | remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures.Details
remodel 1 kitchen & 2 bathrooms. new cabinets, and coutop & new fixtures. | $30,000 |
| Feb 4, 2019 | Completed final sign-off Apr 2026 | 410 29th St | remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows.Details
remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows. | $280,000 |
| Jan 22, 2019 | Completed final sign-off Oct 2019 | 1 Miguel St | remodel bathroom on north side of lower level. bathroom approximately 7' x 10'Details
remodel bathroom on north side of lower level. bathroom approximately 7' x 10' | $40,000 |
| Aug 7, 2018 | Completed final sign-off Jun 2019 | 268 Prospect Av | repair and replace finishes, damaged as a result of fire. new hardwood floors, new bathroom tiles, new drywall, electrical wires, outlets, fixture, switches as needed. replacement of framing in kind. exterior work under separate permit.Details
repair and replace finishes, damaged as a result of fire. new hardwood floors, new bathroom tiles, new drywall, electrical wires, outlets, fixture, switches as needed. replacement of framing in kind. exterior work under separate permit. | $88,000 |
| May 22, 2018 | Completed final sign-off Jun 2019 | 268 Prospect Av | to comply w/ nov#201728203 exploratory demolition of lath & plaster to investigate extent of fire damage in walls & ceilings. remove lath & plaster from 1 wall in ceiling living rm & dining rm. remove tile finishes in bathroom upstairs one wall in rear bedrooms. replace in-kind.Details
to comply w/ nov#201728203 exploratory demolition of lath & plaster to investigate extent of fire damage in walls & ceilings. remove lath & plaster from 1 wall in ceiling living rm & dining rm. remove tile finishes in bathroom upstairs one wall in rear bedrooms. replace in-kind. | $7,600 |
| Mar 2, 2018 | Completed final sign-off Jun 2022 | 523 Alvarado St | 3 floor horizontal addition @ rear. interior remodel. replace front facade windows in-kind with new wood windows. 1 new master bedroom, 1 new bathroom & 1 new living room, 1 new family room, 1 new mech room, 1 new wine storage.Details
3 floor horizontal addition @ rear. interior remodel. replace front facade windows in-kind with new wood windows. 1 new master bedroom, 1 new bathroom & 1 new living room, 1 new family room, 1 new mech room, 1 new wine storage. | $500,000 |
| Oct 13, 2017 | Completed final sign-off May 2018 | 142 De Soto St | kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windowsDetails
kitchen & bathroom remodel. new finishes, fixtures. removal of exterior door and 2 windows, installation of 1 new window & replacement of existing bay windows | $40,000 |
| Mar 15, 2017 | Completed final sign-off Sep 2020 | 147 29th St | vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floorDetails
vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floor | $650,000 |
| Jul 14, 2016 | Completed final sign-off Aug 2018 | 1027 Church St | replace tile, change toilet and vanity ; tile shower - work all to take place in 2nd bath on 3/fDetails
replace tile, change toilet and vanity ; tile shower - work all to take place in 2nd bath on 3/f | $15,000 |
| Apr 1, 2016 | Completed final sign-off Oct 2016 | 522 Valley St | replace bathroom fixtures & fittings. replace kitchen cabinets & counters.Details
replace bathroom fixtures & fittings. replace kitchen cabinets & counters. | $25,000 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 522 Valley St | replace tile in bathroom on floor & three walls around bathtub. existing fixts to remain. no elect or plumbing work.Details
replace tile in bathroom on floor & three walls around bathtub. existing fixts to remain. no elect or plumbing work. | $6,000 |
| Mar 21, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout.Details
remodel kitchen and baths, remove cracked plaster through out and replace with drywall, redo electrical and plumbing throughout. | $220,000 |
| Mar 3, 2016 | Completed final sign-off Jul 2018 | 4225 23rd St | vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping.Details
vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping. | $600,000 |
| Feb 22, 2016 | Completed final sign-off Apr 2016 | 1075 Valencia St | revision to pa#2016-0129-8398. change from partial to full bathroom. remodel & replace plaster throughout unit #1 only.Details
revision to pa#2016-0129-8398. change from partial to full bathroom. remodel & replace plaster throughout unit #1 only. | $25,000 |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 1075 Valencia St | apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall.Details
apt. #1: remodel kitchen. new cabinets. partial bathroom remodel. remove cracked plaster as necessary and replace with drywall. | $50,000 |
| Jan 13, 2015 | Completed final sign-off Sep 2016 | 249 Prospect Av | (e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwellDetails
(e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwell | $70,000 |
| Jul 21, 2014 | Completed final sign-off Dec 2015 | 69 28th St | rooms down remodel. excavation of storage area to add 3 new rooms & 2 baths @ ground lvel. infill below living room. convert attice space to occupied floor & dormer additions. infill 2 lightwells. window replacement & related electrical.Details
rooms down remodel. excavation of storage area to add 3 new rooms & 2 baths @ ground lvel. infill below living room. convert attice space to occupied floor & dormer additions. infill 2 lightwells. window replacement & related electrical. | $290,000 |
| Apr 17, 2014 | Completed final sign-off Nov 2014 | 578 Joost Av | remodel kitchen, bathroom and powder room. replace cabinets, counter tops and fixtures.Details
remodel kitchen, bathroom and powder room. replace cabinets, counter tops and fixtures. | $112,000 |
| Apr 17, 2014 | Completed final sign-off Jun 2015 | 2123 Pierce St | revision to app 201402279481. revise roof framing to remove non-conforming condition where extg roof encrochement into neighboring light well. reconfigure interior stair and master bath. n/a for the maher ordinance #155-13Details
revision to app 201402279481. revise roof framing to remove non-conforming condition where extg roof encrochement into neighboring light well. reconfigure interior stair and master bath. n/a for the maher ordinance #155-13 | $5,000 |
| Feb 27, 2014 | Completed final sign-off Jun 2015 | 2123 Pierce St | revision to appl #2011/0204/9646: reconfiguration of upper floor bath & laundry room, removal of defective roof framing, reframe portion of roof to replace portion of no complying shingle roof system with new 1 hour flat roof to match new addition. compliance with ordinance #155-13 not required.Details
revision to appl #2011/0204/9646: reconfiguration of upper floor bath & laundry room, removal of defective roof framing, reframe portion of roof to replace portion of no complying shingle roof system with new 1 hour flat roof to match new addition. compliance with ordinance #155-13 not required. | |
| Oct 3, 2013 | Completed final sign-off Feb 2015 | 144 Fairmount St | partial excavation of (e) parking & storage areas to add 3 (n) bedrooms, 2 (n) baths on (e) ground level. infill area below (e) sunroom, (n) roo fdeck & dormer at roof level, window replacement & associated work.Details
partial excavation of (e) parking & storage areas to add 3 (n) bedrooms, 2 (n) baths on (e) ground level. infill area below (e) sunroom, (n) roo fdeck & dormer at roof level, window replacement & associated work. | $210,000 |
| Aug 20, 2012 | Completed final sign-off Dec 2012 | 55 Child St | unit #201 - replace vanity in master bath with new cabient, insatll new sink & faucet. in second bathroom re-tile shower enclosure & re-tile bathroom floor.Details
unit #201 - replace vanity in master bath with new cabient, insatll new sink & faucet. in second bathroom re-tile shower enclosure & re-tile bathroom floor. | $8,000 |
| Aug 6, 2012 | Completed final sign-off Jun 2014 | 2701 Larkin St | revision to approved pa 2010/0721/7094 and pa 2012/0612/2406. work includes modifications to partitions in units 200 & 201 to reconfigure bathrooms, kitchens, closets. new finishes. work also includes one new 4x12 post at basement and first levels and 9(n) posts on 2nd floor.Details
revision to approved pa 2010/0721/7094 and pa 2012/0612/2406. work includes modifications to partitions in units 200 & 201 to reconfigure bathrooms, kitchens, closets. new finishes. work also includes one new 4x12 post at basement and first levels and 9(n) posts on 2nd floor. | $75,000 |
| Jun 12, 2012 | Completed final sign-off Jun 2014 | 2701 Larkin St | revision to 2012007217094. work includes transer of 304 sf (less than 25% of unit area) from unit 200 to unit 201. also new partitions, new bath, 2 new powder roomss modifications to doors and window on 3rd floor rear deck. new railings and glass panels on rear deckDetails
revision to 2012007217094. work includes transer of 304 sf (less than 25% of unit area) from unit 200 to unit 201. also new partitions, new bath, 2 new powder roomss modifications to doors and window on 3rd floor rear deck. new railings and glass panels on rear deck | $30,000 |
| Dec 12, 2011 | Completed final sign-off May 2012 | 71 Cuvier St | revision to app #200910159021. relocate inerior partition walls. add door from garage to back yard. minor structural changes, add one bath, per plans.Details
revision to app #200910159021. relocate inerior partition walls. add door from garage to back yard. minor structural changes, add one bath, per plans. | |
| Feb 4, 2011 | Completed final sign-off Jun 2015 | 2123 Pierce St | 826 sf two story addition to rear of a two story single family detached house. an (e) rear deck will be removed for this addition. the addition will add a bedroom and bathroom on the 2nd floor. a family room on the 1st floor. an unfinished crawlspace, an interiorstairway and exterior stairs to theDetails
826 sf two story addition to rear of a two story single family detached house. an (e) rear deck will be removed for this addition. the addition will add a bedroom and bathroom on the 2nd floor. a family room on the 1st floor. an unfinished crawlspace, an interiorstairway and exterior stairs to the | $250,000 |
| Nov 18, 2010 | Expired or cancelled expired Dec 2012 | 1050 North Point St | remodel 2 bathrooms & kitchen. remove ceiling tiles. re sheetrock. remove built ins & replace. repaint throughout. no structural work.Details
remodel 2 bathrooms & kitchen. remove ceiling tiles. re sheetrock. remove built ins & replace. repaint throughout. no structural work. | $75,000 |
| Nov 4, 2010 | Completed final sign-off Dec 2010 | 373 Eureka St | revision to pa# 2009.12.11.3113. reconfigure bathroom and closet at 1st , 2nd and 3rd floor. new laundt at 1st fl. remove doorway at 1st fl family roomDetails
revision to pa# 2009.12.11.3113. reconfigure bathroom and closet at 1st , 2nd and 3rd floor. new laundt at 1st fl. remove doorway at 1st fl family room | |
| Jul 21, 2010 | Completed final sign-off Jun 2014 | 2701 Larkin St | interior remodel to units #100, 101, 200 & 202-2nd & 3rd floors-remodel includes ktichen & bathroom remodeling, new interior closets, minor partition modifications for doors, etc. add 1 powder room (unit #201 & 202 only). new electrical, no changes to bldg exterior, windows or envelopeDetails
interior remodel to units #100, 101, 200 & 202-2nd & 3rd floors-remodel includes ktichen & bathroom remodeling, new interior closets, minor partition modifications for doors, etc. add 1 powder room (unit #201 & 202 only). new electrical, no changes to bldg exterior, windows or envelope | $250,000 |
| Oct 23, 2009 | Completed final sign-off Oct 2010 | 2701 Larkin St | 4th fl only. unit 300: new 1/2 bath, remodel 2 full baths, reduce size of clsoet. unit 301: new 1/2 bath, 2 new closets, remodel kitchen, remodel 2 full bath rooms. unit 302: new 1/2 bathroom, remodel 2 full bathrooms, 3 new closets and remodel kitchen and laundry closet. include structural work.Details
4th fl only. unit 300: new 1/2 bath, remodel 2 full baths, reduce size of clsoet. unit 301: new 1/2 bath, 2 new closets, remodel kitchen, remodel 2 full bath rooms. unit 302: new 1/2 bathroom, remodel 2 full bathrooms, 3 new closets and remodel kitchen and laundry closet. include structural work. | $150,000 |
| Sep 18, 2009 | Completed final sign-off Dec 2010 | 373 Eureka St | revision to appl #200910712857 to include 2 bedrooms & 2 bathrooms @(e) attic. 1 bedroom, bath, sunroom & family in (e) 1st floor garage & new stairs. new dormers in (e) roof & new windows throughout.Details
revision to appl #200910712857 to include 2 bedrooms & 2 bathrooms @(e) attic. 1 bedroom, bath, sunroom & family in (e) 1st floor garage & new stairs. new dormers in (e) roof & new windows throughout. | $160,000 |
| Sep 2, 2009 | Completed final sign-off Jan 2010 | 80 Manchester St | interior remodel including new partitions to create new bedroom on 2nd. floor new bathroom in basement & legalization of (e) office in garage storage new skylights & electrical improvements.Details
interior remodel including new partitions to create new bedroom on 2nd. floor new bathroom in basement & legalization of (e) office in garage storage new skylights & electrical improvements. | $60,000 |
| Aug 17, 2009 | Completed final sign-off Dec 2009 | 3716 Cesar Chavez St | remodel existing bathroom (upper unit). replace 3 fixtures in same location.Details
remodel existing bathroom (upper unit). replace 3 fixtures in same location. | $15,000 |
| Jul 17, 2009 | Completed final sign-off Dec 2010 | 373 Eureka St | remodel kitchen, remodel one bath and convert closet to new bathroom.Details
remodel kitchen, remodel one bath and convert closet to new bathroom. | $60,000 |
| Jun 29, 2009 | Completed final sign-off Oct 2009 | 61 Vicksburg St | carving out wine room, hobby room, 1/2 bath & storage in existing garage. put larger door in place of existing door at rear.Details
carving out wine room, hobby room, 1/2 bath & storage in existing garage. put larger door in place of existing door at rear. | $35,000 |
| Jan 8, 2009 | Completed final sign-off Aug 2009 | 2750 Scott St | remove tile and plumbing fixtures (unit#2750). install new tile, plumbing fixtures and countertop. existing electrical to remain drywall to remain. (bathroom only.)Details
remove tile and plumbing fixtures (unit#2750). install new tile, plumbing fixtures and countertop. existing electrical to remain drywall to remain. (bathroom only.) | $35,000 |
| Dec 1, 2008 | Completed final sign-off Apr 2009 | 318 Texas St | convert closet space to bathroom, convert hall closet to washer/dryer closet, remove pocket door & add closet in bedroom. work in upper unit 318 texas st.Details
convert closet space to bathroom, convert hall closet to washer/dryer closet, remove pocket door & add closet in bedroom. work in upper unit 318 texas st. | $25,000 |
| Sep 16, 2008 | Completed final sign-off Aug 2009 | 2701 Larkin St | revision to appl #200506286306: 2nd floor - remodel trash receptacle storage, remodel bathroom & bedroom at unit 100. remodel kitchen & add new bthroom at unit 101. 3rd floor - remodel kitchen, dining area, bath & add new bedroom, relocate bedroom & kitchen, add new bedroom at unit 200.Details
revision to appl #200506286306: 2nd floor - remodel trash receptacle storage, remodel bathroom & bedroom at unit 100. remodel kitchen & add new bthroom at unit 101. 3rd floor - remodel kitchen, dining area, bath & add new bedroom, relocate bedroom & kitchen, add new bedroom at unit 200. | $30,000 |
| Aug 29, 2008 | Completed final sign-off Apr 2009 | 318 Texas St | reduction in width on north lightwell by 4'-0" at lower floor, remodel kitchen, add new bathroom & relocate bedroom on 2nd floor. reinforce foundation on south wall of garage.Details
reduction in width on north lightwell by 4'-0" at lower floor, remodel kitchen, add new bathroom & relocate bedroom on 2nd floor. reinforce foundation on south wall of garage. | $60,000 |
| Jul 3, 2008 | Completed final sign-off Apr 2009 | 318 Texas St | work @ unit# 320 only. remodel kitchen & 2 bathrooms. new fixtures, fittings, cabinets counter tops & finishes. all interior work.Details
work @ unit# 320 only. remodel kitchen & 2 bathrooms. new fixtures, fittings, cabinets counter tops & finishes. all interior work. | $48,000 |
| Jul 2, 2007 | Completed final sign-off Mar 2008 | 88 28th St | repair dry rotted beam at front of bldg add posts and reinforce footing to support that beam reinforced ceiling and roof joists and two skylights in joist floor bathroom skylights on flat roof behind parapet rot visible front streetDetails
repair dry rotted beam at front of bldg add posts and reinforce footing to support that beam reinforced ceiling and roof joists and two skylights in joist floor bathroom skylights on flat roof behind parapet rot visible front street | $45,000 |
| Jun 22, 2007 | Expired or cancelled expired May 2008 | 75 Whitney St | remodel bathroom on top floor. replace bath fixtures and tileDetails
remodel bathroom on top floor. replace bath fixtures and tile | $20,000 |
| May 18, 2007 | Completed final sign-off Mar 2008 | 88 28th St | remodel kitchen and two and one half baths. and provide min. of 50% of kitchen light wattage in flourescent lights. flourescent lights or occupancy sensor in the bathroom. no window work.Details
remodel kitchen and two and one half baths. and provide min. of 50% of kitchen light wattage in flourescent lights. flourescent lights or occupancy sensor in the bathroom. no window work. | $60,000 |
| May 11, 2007 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom.Details
work at cottage. remodel kitchen & bath. provide: min 50% of kitchen light wattage in flourescent lights. flourescent lights or o.s. in bathroom. | $17,000 |
| Dec 15, 2006 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting.Details
work @ unit# b only. replace kitchen cabinets & counter in unit# b (lower unit) replace vanity in bathroom. remodel powder room. no change in (e) lighting. | $35,000 |
| Oct 24, 2006 | Completed final sign-off Aug 2007 | 1521 Golden Gate Av | remodel two bathroom in 1521 (upper unit) no new lighting.Details
remodel two bathroom in 1521 (upper unit) no new lighting. | $15,000 |
| May 5, 2006 | Completed final sign-off Oct 2006 | 419 Collingwood St | remodel rear bathroom on lower unit. replace tab, change fixtures. work is on 2nd flrDetails
remodel rear bathroom on lower unit. replace tab, change fixtures. work is on 2nd flr | $20,000 |
| Nov 16, 2005 | Completed final sign-off Apr 2006 | 95 05th Av | remodel 1/2 bath on 1st floor, remodel guest bath on 2nd flr, remodel laundry rm on 2nd flr, replace existing fixtures and fittings, add new tile on floors and shower enclosures, add new light fixtures.(2 baths/ laundry. no structDetails
remodel 1/2 bath on 1st floor, remodel guest bath on 2nd flr, remodel laundry rm on 2nd flr, replace existing fixtures and fittings, add new tile on floors and shower enclosures, add new light fixtures.(2 baths/ laundry. no struct | $20,000 |
| Oct 28, 2005 | Expired or cancelled expired May 2007 | 58 Blair Tr | remodel 2 bathrooms,change out fixtures & fittings.retile floor & bath enclosure. bathroom on top floorDetails
remodel 2 bathrooms,change out fixtures & fittings.retile floor & bath enclosure. bathroom on top floor | $15,000 |
| Aug 22, 2005 | Completed final sign-off May 2006 | 2919 Fillmore St | remodel kitchen & 3 bathrooms.kitchen:replace cabinets,new fixtures,new appliances.bathroom:replaceDetails
remodel kitchen & 3 bathrooms.kitchen:replace cabinets,new fixtures,new appliances.bathroom:replace | $125,000 |
| Jan 14, 2004 | Expired or cancelled expired Jun 2005 | 338 28th St | remove bath tub in upper unit & replace with new.retile walls around bath tubDetails
remove bath tub in upper unit & replace with new.retile walls around bath tub | $3,000 |
| Apr 8, 2003 | Never finaled issued Apr 2003, no final | 3099 Jackson St | remove kitchen cabinets & appliances, remove bathroom fix./fittings, remove lath/plaster from wallsDetails
remove kitchen cabinets & appliances, remove bathroom fix./fittings, remove lath/plaster from walls | $3,500 |
| Sep 20, 2002 | Completed final sign-off Jun 2003 | 47 Santa Marina St | remodel kitchen,bathroom (no structural change)Details
remodel kitchen,bathroom (no structural change) | $10,000 |
| Jun 28, 2002 | Completed final sign-off Oct 2002 | 151 Day St | remove fixtures, fittings & drywall in 1 bathroom & downstairs 2 bedroomsDetails
remove fixtures, fittings & drywall in 1 bathroom & downstairs 2 bedrooms | $1,000 |