Back to bathroom remodel contractors
Katz Construction
- Based in
- San Leandro
- On San Francisco permits
- Sep 2015 to Sep 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2015 | Completed final sign-off Dec 2015 | 2512 Octavia St | add new 3'x3' shower to the left of the door, new tile floor. (e) tub/shower enclosure to remain, (e) toilet to remain. move pedestal sink 20" plumbing & wall sconces. bathroom remodelDetails
add new 3'x3' shower to the left of the door, new tile floor. (e) tub/shower enclosure to remain, (e) toilet to remain. move pedestal sink 20" plumbing & wall sconces. bathroom remodel | $10,000 |