Back to bathroom remodel contractors
Karah Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Aug 2026
- Last 24 months
- 8 permits filed
58 permits since 2000: 39 completed, 6 in progress, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 14 completed, 3 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 2205 Sacramento St | remodel (e) kitchen in kind. remodel (e) master bath in kind. remodel (e) 1/2 bath in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
remodel (e) kitchen in kind. remodel (e) master bath in kind. remodel (e) 1/2 bath in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $180,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 2205 Sacramento St | unit 304: remodel hallway bathroom, and master bathroom like for like, kitchen remodel, new plumbing and electrical for all three.Details
unit 304: remodel hallway bathroom, and master bathroom like for like, kitchen remodel, new plumbing and electrical for all three. | $85,000 |
| Apr 21, 2025 | Completed final sign-off Sep 2025 | 2205 Sacramento St | unit 301 - hallway bathroom remodel: new tile, new dedicated electrical outlet, remove and replace existing plumbing. build cabinets and counter in dining room: new stone countertop and backsplash, new electrical light, and outlet for refridgerator.Details
unit 301 - hallway bathroom remodel: new tile, new dedicated electrical outlet, remove and replace existing plumbing. build cabinets and counter in dining room: new stone countertop and backsplash, new electrical light, and outlet for refridgerator. | $42,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 2999 California St | unit #204 repair damage from water leak- bathroom & bedroom. new plumbing new tile replace electrical outlets & lights. repair in kind.Details
unit #204 repair damage from water leak- bathroom & bedroom. new plumbing new tile replace electrical outlets & lights. repair in kind. | $40,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 87 Cervantes Bl | ref pa 202405293141: remove & replace dry rotted studs @ kitchen & dining (10 ft); relocate bathroom vanity @ ground floor, replace 3-2x10 joist and 20 sf redwood decking.Details
ref pa 202405293141: remove & replace dry rotted studs @ kitchen & dining (10 ft); relocate bathroom vanity @ ground floor, replace 3-2x10 joist and 20 sf redwood decking. | $10,000 |
| May 29, 2024 | Completed final sign-off Oct 2024 | 87 Cervantes Bl | add metal spiral stairs from 2/f to g/f. add shower in the existing bathroom at g/fDetails
add metal spiral stairs from 2/f to g/f. add shower in the existing bathroom at g/f | $50,000 |
| Apr 3, 2024 | Expired or cancelled expired Jul 2026 | 855 Hayes St | ref 202402055269- reinforcing (e) 2x12 floor joists (total 4) which have been ripped for plumbing line in master bathroomDetails
ref 202402055269- reinforcing (e) 2x12 floor joists (total 4) which have been ripped for plumbing line in master bathroom | $7,000 |
| Mar 4, 2024 | Completed final sign-off Mar 2025 | 2999 California St | unit 403;new sheetrock in bathroomDetails
unit 403;new sheetrock in bathroom | $1,500 |
| Feb 5, 2024 | Expired or cancelled expired Jul 2026 | 855 Hayes St | remodel existing bathroom, new plumbing, new lighting, new tileDetails
remodel existing bathroom, new plumbing, new lighting, new tile | $20,000 |
| Jun 25, 2019 | Completed final sign-off Nov 2019 | 2999 California St | unit #403: remodel bathroom. new mixing valve/shower, new tiles, new lighting 6x8. new electricalDetails
unit #403: remodel bathroom. new mixing valve/shower, new tiles, new lighting 6x8. new electrical | $60,000 |
| Jun 7, 2019 | Completed final sign-off Feb 2020 | 130 Alhambra St | remodel kitchen (10' x 15'): new cabinets/appliances, no change locations. remodel upstairs bathroom (5' x 8'), remodel downstairs bathroom (5' x 10').Details
remodel kitchen (10' x 15'): new cabinets/appliances, no change locations. remodel upstairs bathroom (5' x 8'), remodel downstairs bathroom (5' x 10'). | $60,000 |
| May 7, 2019 | Completed final sign-off Nov 2019 | 2999 California St | apt 303: remove one (e) non load bearing wall, add 2 new nonload bearing walls to expand (e) closet. remodel (e) bathroom with a new tub and new vanity, fixture and tile to be at same locationDetails
apt 303: remove one (e) non load bearing wall, add 2 new nonload bearing walls to expand (e) closet. remodel (e) bathroom with a new tub and new vanity, fixture and tile to be at same location | $10,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2018 | 850 Powell St | bathroom remodelDetails
bathroom remodel | $15,000 |
| Sep 12, 2016 | Completed final sign-off Sep 2017 | 3035 Octavia St | remodel kitchen and bathroom. no change to walls, doors or openingsDetails
remodel kitchen and bathroom. no change to walls, doors or openings | $75,000 |
| Jul 24, 2015 | Completed final sign-off Nov 2015 | 2205 Sacramento St | remodel bathroom - new tub/tile, remodel 1/2 bath - toilet and vanity, no walls to be altered or removed.Details
remodel bathroom - new tub/tile, remodel 1/2 bath - toilet and vanity, no walls to be altered or removed. | $12,000 |
| Jul 25, 2012 | Completed final sign-off Nov 2012 | 837 Hayes St | remodel bathroom - new tub, toilet, tile.Details
remodel bathroom - new tub, toilet, tile. | $21,000 |
| Jul 26, 2011 | Completed final sign-off Oct 2011 | 2140 Steiner St | remodel bathroom, new plumbing, new electrical, new tile high efficacy lighting or occupancy sensor.Details
remodel bathroom, new plumbing, new electrical, new tile high efficacy lighting or occupancy sensor. | $8,500 |
| Nov 26, 2001 | Completed final sign-off Dec 2001 | 405 Country Club Dr | rev. cost of permit#942470-remodel two bathrooms, install sliding door in basementDetails
rev. cost of permit#942470-remodel two bathrooms, install sliding door in basement | $10,000 |
| Jun 22, 2001 | Completed final sign-off Dec 2001 | 405 Country Club Dr | change crown moulding, mase moulding, casement molding, retile 1 bath , replace doors in kitchenDetails
change crown moulding, mase moulding, casement molding, retile 1 bath , replace doors in kitchen | $12,000 |