Back to bathroom remodel contractors
Kar Tung See Dba: Cbj Design
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Jan 2015
- Last 24 months
- 0 permits filed
35 permits since 2000: 23 completed, 4 never finaled, 8 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 31, 2013 | Completed final sign-off Feb 2014 | 2316 09th Av | remodel bathroom on upper floor (3rd floor), replace sink, counter, shower pan ,new tile file floor, bathroom lighting shall high efficacy or controlled by manual on sensor.Details
remodel bathroom on upper floor (3rd floor), replace sink, counter, shower pan ,new tile file floor, bathroom lighting shall high efficacy or controlled by manual on sensor. | $8,000 |
| Feb 4, 2009 | Expired or cancelled expired Mar 2011 | 2182 14th Av | revision to pa #200501253886, to eliminate 2nd egress requt. per ab-005 and code interpretation egree 002. to expand deck @ front, add half bath in basement, add wetbar @ 3rd fl, add front window @ 3rd floor.Details
revision to pa #200501253886, to eliminate 2nd egress requt. per ab-005 and code interpretation egree 002. to expand deck @ front, add half bath in basement, add wetbar @ 3rd fl, add front window @ 3rd floor. | $2,000 |
| Sep 5, 2006 | Completed final sign-off Jan 2007 | 40 Merced Av | remodel lower level bathroom, patch sheetrock lower level, install wall insulation - no structural changesDetails
remodel lower level bathroom, patch sheetrock lower level, install wall insulation - no structural changes | $10,000 |
| Aug 8, 2006 | Completed final sign-off May 2007 | 2678 18th Av | to add 1 family room, 1 bedroom, 2 full bath room & 1 storage, laundry area on (e) ground floor. remodel (e) kitchen, 2 full bathroom. 1 half bathroom on (e) 2nd floor. replace (e) damaged flooring on 2nd floor. replace (e) damaged exterior siding on rear of building per plan. convert 2 bedroom toDetails
to add 1 family room, 1 bedroom, 2 full bath room & 1 storage, laundry area on (e) ground floor. remodel (e) kitchen, 2 full bathroom. 1 half bathroom on (e) 2nd floor. replace (e) damaged flooring on 2nd floor. replace (e) damaged exterior siding on rear of building per plan. convert 2 bedroom to | $48,000 |
| Dec 23, 2005 | Completed final sign-off Oct 2006 | 25 Vicente St | remodel one 35 sq. bathroom replace fixtures no structural workDetails
remodel one 35 sq. bathroom replace fixtures no structural work | $5,500 |
| Apr 6, 2005 | Completed final sign-off Jan 2006 | 725 Sanchez St | replace 1 ktichen counter/sink only, replace tile/plumbing fixture in bath, remodel bathDetails
replace 1 ktichen counter/sink only, replace tile/plumbing fixture in bath, remodel bath | $6,000 |
| Aug 12, 2003 | Expired or cancelled expired Jun 2004 | 2823 Golden Gate Av | remodel kitchen, install new plumbing/elec.(seperate permit) remodel bath, new insulation, patch &Details
remodel kitchen, install new plumbing/elec.(seperate permit) remodel bath, new insulation, patch & | $25,000 |
| Mar 6, 2003 | Never finaled issued Mar 2003, no final | 33 Forest Knolls Dr | repair dry rot in master bath 5x5 sf only.replace tile/partial. replace one counter top(kitchen).Details
repair dry rot in master bath 5x5 sf only.replace tile/partial. replace one counter top(kitchen). | $2,500 |
| Nov 21, 2002 | Completed final sign-off Jan 2003 | 1476 26th Av | replace plumbing fixtures. replace tile walls in bathroom.Details
replace plumbing fixtures. replace tile walls in bathroom. | $3,500 |