Back to bathroom remodel contractors
Kanler
- Based in
- Tiburon
- On San Francisco permits
- Apr 2001 to Mar 2021
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 expired or cancelled. Typically 184 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2021 | Expired or cancelled withdrawn Feb 2025 | 243 Staples Av | revision to no-plan pa# 202103096160. legalize existing construction of 1321 sqft that consists of 3 bedrooms, 3 bathrooms. converting covered 2-car garage to backyard. replace all (e) windows & doors, like for like of exact same size.Details
revision to no-plan pa# 202103096160. legalize existing construction of 1321 sqft that consists of 3 bedrooms, 3 bathrooms. converting covered 2-car garage to backyard. replace all (e) windows & doors, like for like of exact same size. | $100,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 160 Miraloma Dr | kitchen remodel on 1st fl. remove non bearing wall on 2nd fl per plan. add 1 bedroom, 1 bath, laundry on 2nd fl, remodel e master bedroom, bath. remodel extg closet on 2nd floor.Details
kitchen remodel on 1st fl. remove non bearing wall on 2nd fl per plan. add 1 bedroom, 1 bath, laundry on 2nd fl, remodel e master bedroom, bath. remodel extg closet on 2nd floor. | $40,000 |
| Aug 13, 2014 | Expired or cancelled expired Sep 2018 | 4369 21st St | 1/f: infill rear space, add habitable space, new stair to 2/f., 2/f: remodel kitchen & bathroom. attic: add a full bathroom, add roof deck, add dormer.Details
1/f: infill rear space, add habitable space, new stair to 2/f., 2/f: remodel kitchen & bathroom. attic: add a full bathroom, add roof deck, add dormer. | $100,000 |