Kalix Inc Dbalara Construction
- Based in
- Daly City
- On San Francisco permits
- Sep 2004 to Sep 2026
- Last 24 months
- 13 permits filed
387 permits since 2000: 258 completed, 10 in progress, 62 never finaled, 57 expired or cancelled.
Of the 62 never-finaled permits, 10 are 3 to 5 years old, 18 are 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
27 deck permits: 16 completed, 4 in progress, 4 never finaled, 3 expired or cancelled. Typically 52 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 233 Parker Av | units #201 & 202: replace dry-rotted wood on rear deck in kind within an area of 3'x30', less than 50% repair. deck has access between the two units.Details
units #201 & 202: replace dry-rotted wood on rear deck in kind within an area of 3'x30', less than 50% repair. deck has access between the two units. | $5,000 |
| Feb 24, 2025 | In progress issued Mar 2025 | 2954 Laguna St | revision to work currently underway per 202102205054. addition of new metal awning above penthouse door and revised deck gate locationDetails
revision to work currently underway per 202102205054. addition of new metal awning above penthouse door and revised deck gate location | $1,200 |
| Jul 30, 2024 | In progress issued Nov 2024 | 342 Staples Av | revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work.Details
revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work. | $85,000 |
| Sep 28, 2023 | Never finaled issued Sep 2023, no final | 544 Victoria St | revision to pa# 202109228968, stack w/d and add a laundry sink, add a wall w/door btwn reading nook and hallway, remove hall closet, waterproof ext., stair, and utility sink at garage, revise deck from tile to wood.Details
revision to pa# 202109228968, stack w/d and add a laundry sink, add a wall w/door btwn reading nook and hallway, remove hall closet, waterproof ext., stair, and utility sink at garage, revise deck from tile to wood. | |
| Sep 11, 2023 | In progress issued Oct 2024 | 1046 Diamond St | create an adu at basement by converting fmy rm & laundry rm to kitchen & living and expanding into (e) garage 140sf to build sleeping area & closet. reconfigure last 5 steps of (e) stair to provide upper unit access to garage.relocate wh/boiler.(2)(n) windows on clipper. (n) rear deck & stair.Details
create an adu at basement by converting fmy rm & laundry rm to kitchen & living and expanding into (e) garage 140sf to build sleeping area & closet. reconfigure last 5 steps of (e) stair to provide upper unit access to garage.relocate wh/boiler.(2)(n) windows on clipper. (n) rear deck & stair. | $65,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 612 Lisbon St | replace exterior siding in both sides and back wall with kb hardi-plank. remove and replace rear deck guardrail with siding on wall. not visible from street. approx. 1900 sfDetails
replace exterior siding in both sides and back wall with kb hardi-plank. remove and replace rear deck guardrail with siding on wall. not visible from street. approx. 1900 sf | $12,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2023 | 55 Exeter St | create tv room, bathroom, storage in unfinished 1st fl. rear deck. no expansion to building.Details
create tv room, bathroom, storage in unfinished 1st fl. rear deck. no expansion to building. | $75,000 |
| Sep 22, 2021 | Never finaled issued Jul 2023, no final | 544 Victoria St | convert (e) 1st garage storage into new rooms down including 1 car garage, one bdr, bath rm, kitchenette, and family rm. (e) stair to 2nd fl to remain. remodel/addition will create 961 sqft area @ 1st fl. at 2nd fl a tile deck will installed over new area w/spiral stair to rear.Details
convert (e) 1st garage storage into new rooms down including 1 car garage, one bdr, bath rm, kitchenette, and family rm. (e) stair to 2nd fl to remain. remodel/addition will create 961 sqft area @ 1st fl. at 2nd fl a tile deck will installed over new area w/spiral stair to rear. | $265,000 |
| Aug 30, 2018 | Completed final sign-off May 2019 | 589 Haight St | repair rear deck@ east property line. not visible from the street.Details
repair rear deck@ east property line. not visible from the street. | $5,000 |
| Dec 15, 2016 | Completed final sign-off Jan 2019 | 19 Raleigh St | addition of + 200 sf.at the rear of the home, 1st flr remodel of (e) storage to accommodate 2 bedrooms, 2 bathrooms, laundry, office, closets, (n) stair to be constructed btwn 1st & 2nd flr infilling (e) light well,(n) deck @ 2nd flr over (n) 1st fl addition w/spiral stair to rear yardDetails
addition of + 200 sf.at the rear of the home, 1st flr remodel of (e) storage to accommodate 2 bedrooms, 2 bathrooms, laundry, office, closets, (n) stair to be constructed btwn 1st & 2nd flr infilling (e) light well,(n) deck @ 2nd flr over (n) 1st fl addition w/spiral stair to rear yard | $120,000 |
| Jul 16, 2015 | Never finaled issued Dec 2015, no final | 201 Roosevelt Wy | construct (n) deck on roof, 42" open guardrails at all perimeters. 10 day notification required due to rear-setback encroachment. replace window with door to access new deck. this permit is for roof deck only. other work is permitted under a different pa# 2015/05/13/6259.Details
construct (n) deck on roof, 42" open guardrails at all perimeters. 10 day notification required due to rear-setback encroachment. replace window with door to access new deck. this permit is for roof deck only. other work is permitted under a different pa# 2015/05/13/6259. | $1,000 |
| Mar 27, 2015 | Completed final sign-off Aug 2015 | 260 Guerrero St | legalize rear stair by unpermitted deck and retaining (e) rear staire that comply with egress req's. add cross bracing. per za interruption4/96 - not exact replacement - stairs to comply with bld code for egress. also, no fire wall will be included on the stair structure.Details
legalize rear stair by unpermitted deck and retaining (e) rear staire that comply with egress req's. add cross bracing. per za interruption4/96 - not exact replacement - stairs to comply with bld code for egress. also, no fire wall will be included on the stair structure. | $2,500 |
| Mar 12, 2015 | Never finaled issued Feb 2016, no final | 4820 Fulton St | convert(e)ground fl garage & storage to garage & separate dwelling unit by bldg(e)interior garage space & expand 1-story into rearyard.(n)grnd fl unit to include 1-bedrm, 1-bath, 1-kitchn, closets, laundry & living rm. add 2nd fl/remodel to accomodate/relocate stair to garage & remodel kitchn & deckDetails
convert(e)ground fl garage & storage to garage & separate dwelling unit by bldg(e)interior garage space & expand 1-story into rearyard.(n)grnd fl unit to include 1-bedrm, 1-bath, 1-kitchn, closets, laundry & living rm. add 2nd fl/remodel to accomodate/relocate stair to garage & remodel kitchn & deck | $64,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2018 | 70 Beaumont Av | renovate 2nd floor kitchen, dining, living, powder rm and add deck, add 3rd floor master suite, 2 bedrooms, 2 full baths and stairDetails
renovate 2nd floor kitchen, dining, living, powder rm and add deck, add 3rd floor master suite, 2 bedrooms, 2 full baths and stair | $285,000 |
| Mar 11, 2014 | Completed final sign-off Mar 2015 | 219 Guerrero St | add new exterior wood deck and guard rail at 2nd floor roof of a two unit bldg. relocate one skylight. deck will be accessed by one dwelling unit only. replace window with door. deck is 285 sq ft.Details
add new exterior wood deck and guard rail at 2nd floor roof of a two unit bldg. relocate one skylight. deck will be accessed by one dwelling unit only. replace window with door. deck is 285 sq ft. | $17,500 |
| Oct 18, 2012 | Expired or cancelled cancelled Dec 2012 | 1682 Alemany Bl | addition of approx 185 sf of area @ the 1st flr, about 1/3 of this area is under an (e) 2nd flr bay. additiohn of a deck at the 2nd flr over the new 1st flr area, new area includes storage rooms, closet & bathroom, no work at the 3rd flr.Details
addition of approx 185 sf of area @ the 1st flr, about 1/3 of this area is under an (e) 2nd flr bay. additiohn of a deck at the 2nd flr over the new 1st flr area, new area includes storage rooms, closet & bathroom, no work at the 3rd flr. | $12,000 |
| Jul 16, 2012 | Completed final sign-off Nov 2012 | 50 Clifford Tr | remove and replace lower deck boards. less than 50% repair in kind.Details
remove and replace lower deck boards. less than 50% repair in kind. | $7,800 |
| Dec 27, 2011 | Completed final sign-off Mar 2012 | 1732 Page St | existing rear yard deck repair to comply with complaint 201173593. (less than 50% deck repair)Details
existing rear yard deck repair to comply with complaint 201173593. (less than 50% deck repair) | $4,000 |
| Jul 14, 2011 | Completed final sign-off Dec 2012 | 50 Clifford Tr | add new exterior wood deck at second fl level rear of existing single house. the deck will require a variance for its location in the required rear yard.Details
add new exterior wood deck at second fl level rear of existing single house. the deck will require a variance for its location in the required rear yard. | $25,000 |
| Jun 8, 2010 | Completed final sign-off Mar 2012 | 1662 08th Av | rebuild (e) stair to 1st floor. remodel (e) 1st fl rooms, in fill light wells on both sides of house. construct new wood deck at rear of bldg. no vertical expansion.Details
rebuild (e) stair to 1st floor. remodel (e) 1st fl rooms, in fill light wells on both sides of house. construct new wood deck at rear of bldg. no vertical expansion. | $90,000 |
| Aug 14, 2008 | Expired or cancelled expired Dec 2009 | 436 Buchanan St | interior remodel of two units, no change to build envelope. reconfiguration of interior walls, upgrade of kitchen & bath appliances, replacement of all exterior windows w/ similar wood windows, rebuild of exterior deck & stair.Details
interior remodel of two units, no change to build envelope. reconfiguration of interior walls, upgrade of kitchen & bath appliances, replacement of all exterior windows w/ similar wood windows, rebuild of exterior deck & stair. | $50,000 |
| Jun 13, 2008 | Completed final sign-off Apr 2009 | 53 28th St | new 3rd floor (attic) framing, stairs and windows. new insulation and gyp board, new skylights, minor kitchen remodel, family room. remodel includes new sliding glass door, replacement window in kind, replacement of (e) rear decks and stairsDetails
new 3rd floor (attic) framing, stairs and windows. new insulation and gyp board, new skylights, minor kitchen remodel, family room. remodel includes new sliding glass door, replacement window in kind, replacement of (e) rear decks and stairs | $48,500 |
| Dec 22, 2005 | Completed final sign-off Dec 2006 | 1630 Clay St | addition of private decks on three levels at rear of bldg storage units at ground levelDetails
addition of private decks on three levels at rear of bldg storage units at ground level | $20,000 |
| Nov 22, 2005 | Expired or cancelled expired May 2009 | 87 Melrose Av | 3rd story addition and connecting stair to (e) 2nd fl. replace (e) windows 2 rear facade and replace (e) vinyl siding 2/(n) cement plaster. rebuild rear deckDetails
3rd story addition and connecting stair to (e) 2nd fl. replace (e) windows 2 rear facade and replace (e) vinyl siding 2/(n) cement plaster. rebuild rear deck | $120,000 |
| Sep 28, 2005 | Completed final sign-off Feb 2006 | 1630 Clay St | remodel of 3 rear units - renovate kitchen & bath, new french doors & guardrails at future deck.Details
remodel of 3 rear units - renovate kitchen & bath, new french doors & guardrails at future deck. | $90,000 |
| Mar 31, 2005 | Completed final sign-off Aug 2005 | 1368 Church St | remove & replace damaged wood from flr level porch/deck-replace damgaed material w/pressure treatedDetails
remove & replace damaged wood from flr level porch/deck-replace damgaed material w/pressure treated | $10,000 |
| Sep 27, 2004 | Completed final sign-off Sep 2005 | 549 Guerrero St | replace deck + stair. install new fence +1-10'l. on north prop.line. ref vanance app#20040620v.Details
replace deck + stair. install new fence +1-10'l. on north prop.line. ref vanance app#20040620v. | $5,000 |