Back to bathroom remodel contractors
Kaifa Construction Inc
- Based in
- San Pablo
- On San Francisco permits
- Dec 2012 to Jun 2026
- Last 24 months
- 13 permits filed
44 permits since 2000: 36 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 2 in progress. Typically 12 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 1168 Kearny St | remodel kitchen approx 60 sq ft, one bathroom 5'x8' upgrade electrical wiring and outlet, new insulation. remove sheetrock 840 sf ft in living room and bedroom, replacxe in kind., all work in-kind. all sheetrock to be 5/8" type x.Details
remodel kitchen approx 60 sq ft, one bathroom 5'x8' upgrade electrical wiring and outlet, new insulation. remove sheetrock 840 sf ft in living room and bedroom, replacxe in kind., all work in-kind. all sheetrock to be 5/8" type x. | $13,000 |
| Jan 6, 2026 | Completed final sign-off Aug 2026 | 3411 Irving St | remodel (e) kitchen and bathroom @ 3rd floor unit 3411. replace (e) stairway less than 50% in kind common area. no wall removal included under this permit. relocate two furnaces in kind @ garage.Details
remodel (e) kitchen and bathroom @ 3rd floor unit 3411. replace (e) stairway less than 50% in kind common area. no wall removal included under this permit. relocate two furnaces in kind @ garage. | $5,000 |
| Apr 3, 2025 | In progress issued May 2025 | 545 Thornton Av | 1/f: 2 (n) bedrooms, 1 (n) bath, (n) living rm, (n) dining rm, remodel (e) bath, remove stairs to 2/f. 2/f: replace all rear side windows per plan. remodel kitchen. convert (e) bath to 2 (n) bath. remove stair to 1/fDetails
1/f: 2 (n) bedrooms, 1 (n) bath, (n) living rm, (n) dining rm, remodel (e) bath, remove stairs to 2/f. 2/f: replace all rear side windows per plan. remodel kitchen. convert (e) bath to 2 (n) bath. remove stair to 1/f | $60,000 |
| Feb 13, 2025 | Completed final sign-off Jan 2026 | 1439 Silver Av | remodel (e) kitchen, bathroom. add 1 (n) full bathroom & replace (e) sheetrock w/ new . all work on 2/f. infill property line window.Details
remodel (e) kitchen, bathroom. add 1 (n) full bathroom & replace (e) sheetrock w/ new . all work on 2/f. infill property line window. | $168,000 |
| Dec 13, 2024 | Completed final sign-off Oct 2025 | 180 Saint Charles Av | to comply with nov #202430627 relocate & remodel (e) kitchen at 2nd fl & (n) bedroom at 2nd fl. remove walls at dining area, infill stairway interior, w/hallway bathroom.Details
to comply with nov #202430627 relocate & remodel (e) kitchen at 2nd fl & (n) bedroom at 2nd fl. remove walls at dining area, infill stairway interior, w/hallway bathroom. | $40,000 |
| Jul 16, 2024 | Completed final sign-off Aug 2025 | 161 Laura St | convert (e) grage space to 547sf habitable spacew with a new bathrom with new access door to ground floor area. convert (e) closets to (n) bathroom on main floor. remodel (e) kitchen and (e) bathroom.Details
convert (e) grage space to 547sf habitable spacew with a new bathrom with new access door to ground floor area. convert (e) closets to (n) bathroom on main floor. remodel (e) kitchen and (e) bathroom. | $60,000 |
| Apr 2, 2024 | Completed final sign-off Jan 2026 | 226 24th Av | work located on the upper floor- bathroom and kitchen renovation, one window replacement (not street facing), removal of short partition walls.Details
work located on the upper floor- bathroom and kitchen renovation, one window replacement (not street facing), removal of short partition walls. | $50,000 |
| Aug 25, 2023 | Completed final sign-off Apr 2024 | 1591 24th Av | add half bath @ 2nd flr, remodel kitchen & bath, replace front windows in-kind with alum-clad, replace front facade cement plaster in-kind.Details
add half bath @ 2nd flr, remodel kitchen & bath, replace front windows in-kind with alum-clad, replace front facade cement plaster in-kind. | $25,000 |
| Dec 6, 2021 | Completed final sign-off Oct 2022 | 1738 17th Av | g/f: add 1 full bathroom, add media room and wet bar, add 355sf habitable space. 2/f: remodel (e) master athroom and add 1 new full bathroom.Details
g/f: add 1 full bathroom, add media room and wet bar, add 355sf habitable space. 2/f: remodel (e) master athroom and add 1 new full bathroom. | $70,000 |
| Sep 8, 2021 | Completed final sign-off Nov 2024 | 318 Gambier St | in kind kitchen and bath remodel. replace windows with aluminum-clad windows, vinyl elsewhere. same size and config. u factor max 0.30Details
in kind kitchen and bath remodel. replace windows with aluminum-clad windows, vinyl elsewhere. same size and config. u factor max 0.30 | $20,000 |
| Sep 2, 2021 | Completed final sign-off Oct 2022 | 1738 17th Av | demolition dry wall & replace new led lights w/sensor 5/8" type x. all work on 2nd floor no walls removed, one bath and one kitchen remodel. non structural.Details
demolition dry wall & replace new led lights w/sensor 5/8" type x. all work on 2nd floor no walls removed, one bath and one kitchen remodel. non structural. | $5,000 |
| Apr 12, 2021 | Completed final sign-off Jan 2022 | 350 Wayland St | ground floor - add on study room, two full baths, and one family room 870 sqftDetails
ground floor - add on study room, two full baths, and one family room 870 sqft | $40,000 |
| Sep 26, 2020 | Completed final sign-off Apr 2022 | 56 Exeter St | to comply with nov # 202036984: 1st floor:two bedrooms & two bathroom,yoga room. relocate laundry area. 2nd floor: new bathroom & bedroom.Details
to comply with nov # 202036984: 1st floor:two bedrooms & two bathroom,yoga room. relocate laundry area. 2nd floor: new bathroom & bedroom. | $60,000 |
| Feb 24, 2020 | Completed final sign-off Feb 2022 | 24 Cross St | adu under ordinance 162-16. add dwelling unit (665 sqft) to (e) bldg on 1st fl. (n) unit includes (1) bedroom, (1) bathroom, (1) half bath, (1) office, kitchen, living & dining roomDetails
adu under ordinance 162-16. add dwelling unit (665 sqft) to (e) bldg on 1st fl. (n) unit includes (1) bedroom, (1) bathroom, (1) half bath, (1) office, kitchen, living & dining room | $58,000 |
| Dec 13, 2019 | Completed final sign-off Dec 2021 | 26 Cross St | remodel (e) bedroom & bathroom, add 2 bedrooms and one study & 2 bathrooms on 2nd flDetails
remodel (e) bedroom & bathroom, add 2 bedrooms and one study & 2 bathrooms on 2nd fl | $46,000 |
| Dec 6, 2019 | Completed final sign-off Nov 2021 | 26 Cross St | remove lath and plaster at bedrooms & living and dining rooms. remodel existing kitchen & bathroom in kindDetails
remove lath and plaster at bedrooms & living and dining rooms. remodel existing kitchen & bathroom in kind | $10,000 |
| Jul 3, 2019 | Completed final sign-off Jan 2020 | 2429 Cabrillo St | remodel (e) kitchen 10x10 & bathroom 5x8 on 3rd floor top unit. replace (e) windows (8) at rear side. upgrade top unit electrial, add sub panel 100 amp.Details
remodel (e) kitchen 10x10 & bathroom 5x8 on 3rd floor top unit. replace (e) windows (8) at rear side. upgrade top unit electrial, add sub panel 100 amp. | $50,000 |
| Dec 5, 2012 | Completed final sign-off Sep 2014 | 357 Union St | interior remodel:add bedroom, full bath on ground floor. add interior stair and replace existing brick foundationDetails
interior remodel:add bedroom, full bath on ground floor. add interior stair and replace existing brick foundation | $12,000 |