Back to bathroom remodel contractors
Kacey Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Feb 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2016 | Completed final sign-off Aug 2016 | 64 Dunsmuir St | add two bedrooms, entertainment, (2) full bathrooms, den & mud room on 1st floor per plan. add full bath & remodel (e) full bath on 2nd floor per plan.Details
add two bedrooms, entertainment, (2) full bathrooms, den & mud room on 1st floor per plan. add full bath & remodel (e) full bath on 2nd floor per plan. | $40,000 |
| May 17, 2010 | Completed final sign-off Jul 2010 | 1250 48th Av | replace sheetrock in entire unit 5/8' type x and replace and install all plumbing fixtures and retile wall and floor in bath. no structural. no new lighting or mechDetails
replace sheetrock in entire unit 5/8' type x and replace and install all plumbing fixtures and retile wall and floor in bath. no structural. no new lighting or mech | $10,000 |
| Apr 3, 2009 | Completed final sign-off Jul 2009 | 2495 33rd Av | add 2 bedrooms, one family room and one bath at ground floor.Details
add 2 bedrooms, one family room and one bath at ground floor. | $30,000 |
| Aug 25, 2008 | Completed final sign-off Jan 2009 | 1855 29th Av | 2nd fl - remodel kitchen & bathrm, remove section of wall, new cabinets, counter & appliances, title, replaced all fixtures in bath. ground fl: convert existing play rm to new bedrm, add family rm and bathr, storage area. approx 2000'.Details
2nd fl - remodel kitchen & bathrm, remove section of wall, new cabinets, counter & appliances, title, replaced all fixtures in bath. ground fl: convert existing play rm to new bedrm, add family rm and bathr, storage area. approx 2000'. | $45,000 |
| Jun 20, 2008 | Completed final sign-off Aug 2008 | 2643 23rd Av | convert a portion of ex. garage space into new 2 bedrooms, 1 office and a full bathDetails
convert a portion of ex. garage space into new 2 bedrooms, 1 office and a full bath | $35,000 |
| Oct 10, 2007 | Completed final sign-off Jan 2008 | 58 Scotia Av | add a bedroom, a study, a bathroom and storage at ground floor.Details
add a bedroom, a study, a bathroom and storage at ground floor. | $25,000 |
| Sep 5, 2007 | Completed final sign-off Dec 2007 | 214 Ney St | remodel @ ground floor to create two new bedrooms, one study & two full bathroomsDetails
remodel @ ground floor to create two new bedrooms, one study & two full bathrooms | $20,000 |
| Jul 27, 2007 | Completed final sign-off Jan 2008 | 611 37th Av | add: 1-bedroom w/ half bath, 1-family room w/ storage at existing ground flr. remodel at (e) 3rd. flr.-unit 611-37th. ave. to create bedroom #3 and bathroom #2. (interior work only non-structural)Details
add: 1-bedroom w/ half bath, 1-family room w/ storage at existing ground flr. remodel at (e) 3rd. flr.-unit 611-37th. ave. to create bedroom #3 and bathroom #2. (interior work only non-structural) | $30,000 |
| Mar 24, 2004 | Never finaled issued Mar 2004, no final | 660 05th Av | remodeling bathroom , painting interior, no structural workDetails
remodeling bathroom , painting interior, no structural work | $9,000 |
| Nov 5, 2003 | Completed final sign-off Feb 2004 | 658 05th Av | romodeling the bathroom/replace windows on 2nd floor 15th total/painting interiorDetails
romodeling the bathroom/replace windows on 2nd floor 15th total/painting interior | $18,000 |
| Dec 19, 2001 | Completed final sign-off Apr 2002 | 170 Cresta Vista Dr | remodel kitchen & 2 bathroom. 5 wood windows. replace in kind. no structural work.Details
remodel kitchen & 2 bathroom. 5 wood windows. replace in kind. no structural work. | $11,000 |