Back to bathroom remodel contractors
K & R Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2015 to Aug 2026
- Last 24 months
- 3 permits filed
40 permits since 2000: 30 completed, 3 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 12 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2026 | In progress issued Jun 2026 | 739 10th Av | remodel of (e) primary bedroom to include new primary bathroom. remodel of (e) hallway, bedroom #1 and bedroom #2 to include new full-height closets. remodel of (e) 1/f storage to include new full-height closets. removal of (e) interior walls, partitions and doors at 1/f, 3/f. new interior finishes.Details
remodel of (e) primary bedroom to include new primary bathroom. remodel of (e) hallway, bedroom #1 and bedroom #2 to include new full-height closets. remodel of (e) 1/f storage to include new full-height closets. removal of (e) interior walls, partitions and doors at 1/f, 3/f. new interior finishes. | $30,000 |
| Jul 6, 2018 | Completed final sign-off Nov 2019 | 1262 Vermont St | repair: garage post & beams, foundation. remodel kitchen & 3 bathrooms.Details
repair: garage post & beams, foundation. remodel kitchen & 3 bathrooms. | $35,000 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 1129 Cayuga Av | legalize downstairs existing bathroom and bedroom, remove plaster in living room to insulate walls. install new 4" x 12" beam per plansDetails
legalize downstairs existing bathroom and bedroom, remove plaster in living room to insulate walls. install new 4" x 12" beam per plans | $9,000 |
| Jul 20, 2016 | Completed final sign-off Mar 2017 | 1129 Cayuga Av | remodel kitchen flor like. remodel (e) bathroom for like. add (n) electrical outlets in living room.Details
remodel kitchen flor like. remodel (e) bathroom for like. add (n) electrical outlets in living room. | $22,000 |
| Feb 16, 2016 | Completed final sign-off Jul 2016 | 2924 Fillmore St | this project consists of a bathroom addition with the footprint of the (e) building. no walls to be demolished.Details
this project consists of a bathroom addition with the footprint of the (e) building. no walls to be demolished. | $6,000 |
| Feb 2, 2016 | Completed final sign-off Mar 2016 | 2926 Fillmore St | replace (e) kitchen cabinets, appliances and plumbing fixtures, no changes to the existing floor plan appliances and plumbing fixtures to remain in (e) location. replace (e) bathroom plumbing fixtures no changes to (e) floor plan.Details
replace (e) kitchen cabinets, appliances and plumbing fixtures, no changes to the existing floor plan appliances and plumbing fixtures to remain in (e) location. replace (e) bathroom plumbing fixtures no changes to (e) floor plan. | $34,800 |