Back to bathroom remodel contractors
K P Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Aug 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 4 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2015 | Completed final sign-off Mar 2015 | 436 Duncan St | install new electrical cans in ceiling. remove sheekrock from ceiling & install new sheetrock, same opening. covert existing door in bathroom to pocket door.Details
install new electrical cans in ceiling. remove sheekrock from ceiling & install new sheetrock, same opening. covert existing door in bathroom to pocket door. | $1,500 |
| Jul 18, 2005 | Expired or cancelled expired Feb 2008 | 2013 Oak St | remodle kitchen-new cabinets, dishwasher, new outlets, sheetrock + paint. remodle bathroom-new tub,Details
remodle kitchen-new cabinets, dishwasher, new outlets, sheetrock + paint. remodle bathroom-new tub, | $27,500 |