K M D Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2008 to Jul 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 23 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2008 | Completed final sign-off Apr 2009 | 1817 Sutter St | remodel existing kitchen and bath on ground floor, lower unit. split large bedroom into 2 offices. electrical panel upgrade.Details
remodel existing kitchen and bath on ground floor, lower unit. split large bedroom into 2 offices. electrical panel upgrade. | $20,000 |