K L W Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Jul 2026
- Last 24 months
- 6 permits filed
97 permits since 2000: 83 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 7 completed, 1 in progress. Typically 5 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2021 | Completed final sign-off May 2022 | 2427 26th Av | 2nd floor: remodel kitchen/bath, add 1/2 bath, add deck & stairs. infill below sunroom, add bedroom, family, office, & full bath on 1st floor. new vinyl window/door @ rear. add lights upgrade electrical & plumbing system.Details
2nd floor: remodel kitchen/bath, add 1/2 bath, add deck & stairs. infill below sunroom, add bedroom, family, office, & full bath on 1st floor. new vinyl window/door @ rear. add lights upgrade electrical & plumbing system. | $100,000 |
| Dec 31, 2019 | In progress issued Nov 2024 | 4006 25th St | rear horizontal additon @ basement & 1st floor kitchen.(n) coat closert & powder rm. in(e) dining room.(n)master bath on part of (e) 2nd floor open deck replace (e) gas gravity furnace & dosmestic hot water with heat pump. new adu @ 1st floor.Details
rear horizontal additon @ basement & 1st floor kitchen.(n) coat closert & powder rm. in(e) dining room.(n)master bath on part of (e) 2nd floor open deck replace (e) gas gravity furnace & dosmestic hot water with heat pump. new adu @ 1st floor. | $500,000 |
| Jul 1, 2019 | Completed final sign-off May 2021 | 567 04th Av | remodel kitchen , bath, & laundry, add a deck on 2nd floor. remodel bath, add 2 bath on 3rd fl. add 2nd unit on 1st fl including 2 bedrooms, a bath, living/kitchen. relocate front door. replace foundation. replace water heater, furnace. upgrade elec & plmg syst.Details
remodel kitchen , bath, & laundry, add a deck on 2nd floor. remodel bath, add 2 bath on 3rd fl. add 2nd unit on 1st fl including 2 bedrooms, a bath, living/kitchen. relocate front door. replace foundation. replace water heater, furnace. upgrade elec & plmg syst. | $180,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 3847 25th St | remodel kitchen & bath, add a bath, remove wall on 2nd floor. legalize bedroom & full bath on 1st floor. replace deck & stairs at rear. replace with aluminum clad windows @ front in kind & vinyl windows at rear. replace water heater, furnace, upgrade electrical & plumbing systemDetails
remodel kitchen & bath, add a bath, remove wall on 2nd floor. legalize bedroom & full bath on 1st floor. replace deck & stairs at rear. replace with aluminum clad windows @ front in kind & vinyl windows at rear. replace water heater, furnace, upgrade electrical & plumbing system | $95,000 |
| Dec 10, 2014 | Completed final sign-off Jul 2015 | 2226 47th Av | work consists of interior wall removal and new rear deckDetails
work consists of interior wall removal and new rear deck | $18,000 |
| Nov 18, 2014 | Completed final sign-off Oct 2015 | 117 Dellbrook Av | add a deck at rear yard.Details
add a deck at rear yard. | $2,500 |
| Aug 23, 2012 | Completed final sign-off Mar 2013 | 171 20th Av | remodel (e) kitchen, remove wall between dining room and kitchen, replace (e) unsound windows and door at groundfloor, repair rotten deck and stairs, no work on 2nd floor.Details
remodel (e) kitchen, remove wall between dining room and kitchen, replace (e) unsound windows and door at groundfloor, repair rotten deck and stairs, no work on 2nd floor. | $20,000 |
| Aug 15, 2011 | Completed final sign-off Mar 2012 | 3749 Clement St | repair dryrot @ north side window above existing deck, replace approx. 40 sf of stuccoDetails
repair dryrot @ north side window above existing deck, replace approx. 40 sf of stucco | $3,500 |