Back to bathroom remodel contractors
K L Construction & Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Oct 2024
- Last 24 months
- 1 permit filed
27 permits since 2000: 25 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 3701 Divisadero St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $30,000 |
| Sep 3, 2024 | Completed final sign-off Feb 2025 | 813 York St | 1/f: convert (e) den into (n) kitchen, remodel (e) kitchen into (n) media room, remodel (e) living room to be bedroom. remodel (e) bathroom.Details
1/f: convert (e) den into (n) kitchen, remodel (e) kitchen into (n) media room, remodel (e) living room to be bedroom. remodel (e) bathroom. | $45,000 |
| Jun 29, 2023 | Completed final sign-off Sep 2023 | 20 North View Ct | in kind one 8 x 7 bathroom remodel. non structuralDetails
in kind one 8 x 7 bathroom remodel. non structural | $20,000 |
| Jun 8, 2023 | Completed final sign-off Sep 2023 | 1634 Funston Av | bathroom remodel in-kind. 3rd fl/ 9'x6'.Details
bathroom remodel in-kind. 3rd fl/ 9'x6'. | $20,000 |
| Jul 19, 2022 | Completed final sign-off Aug 2022 | 129 Acadia St | 8 window replacement- marvin wood clad one casement front window- milgrad- bedroom, kitchen, bathroom:eight total windowsDetails
8 window replacement- marvin wood clad one casement front window- milgrad- bedroom, kitchen, bathroom:eight total windows | $7,000 |
| Sep 22, 2021 | Completed final sign-off Feb 2022 | 2350 21st Av | (1) bathroom remodel in kind- lighting comply with cec. 150.0(k)Details
(1) bathroom remodel in kind- lighting comply with cec. 150.0(k) | $10,000 |
| Aug 24, 2020 | Completed final sign-off Feb 2024 | 669 16th Av | ground floor level renovation & alteration incl adding 1 bed, 1 bath & 1 utility sink, garage door widening.Details
ground floor level renovation & alteration incl adding 1 bed, 1 bath & 1 utility sink, garage door widening. | $55,200 |
| Sep 21, 2016 | Completed final sign-off Nov 2016 | 571 Vienna St | bathroom remodek, elect. service panel upgrade.Details
bathroom remodek, elect. service panel upgrade. | $15,000 |
| Sep 13, 2012 | Completed final sign-off Oct 2012 | 1730 18th Av | remodel existing bathroom and kitchen on the upper floor.Details
remodel existing bathroom and kitchen on the upper floor. | $5,000 |
| Jul 17, 2012 | Completed final sign-off Sep 2012 | 2474 42nd Av | remodel (e) residence-add storage rooms, bathroom at ground level, replace window at garage floorDetails
remodel (e) residence-add storage rooms, bathroom at ground level, replace window at garage floor | $5,000 |
| Oct 4, 2007 | Completed final sign-off Jul 2008 | 447 Ramsell St | to partition g/f, one bedrm, full bath & storage rm.Details
to partition g/f, one bedrm, full bath & storage rm. | $44,000 |
| Jan 11, 2007 | Completed final sign-off Jun 2007 | 1322 La Playa | 1)bathroom: change wall, floor, tiles, add exhaust fan, change lighting fixture. shower, toilet, bathtub, sink, light replacement in kind. 2) kchn: change out kchn floor tiles. 3) change out room dresser door to sliding door. fireplace change and cosmetic change onlyDetails
1)bathroom: change wall, floor, tiles, add exhaust fan, change lighting fixture. shower, toilet, bathtub, sink, light replacement in kind. 2) kchn: change out kchn floor tiles. 3) change out room dresser door to sliding door. fireplace change and cosmetic change only | $6,000 |
| Nov 22, 2002 | Expired or cancelled expired Jul 2003 | 100 Shotwell St | to add a new bathroom to 102,106,110 shotwellDetails
to add a new bathroom to 102,106,110 shotwell | $12,000 |
| Jul 8, 2002 | Completed final sign-off Oct 2002 | 106 Shotwell St | change kitchen cabinet, bathroom tiles only no structural workDetails
change kitchen cabinet, bathroom tiles only no structural work | $3,000 |