Back to bathroom remodel contractors
K K C Structural & Building Consruction
- Based in
- Bay Point
- On San Francisco permits
- Mar 2013 to Jul 2026
- Last 24 months
- 1 permit filed
16 permits since 2000: 14 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 5 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2023 | Completed final sign-off Apr 2024 | 867 40th Av | remodel (e) kitchen and (e) bathroom in-kindDetails
remodel (e) kitchen and (e) bathroom in-kind | $5,000 |
| Jan 7, 2022 | Completed final sign-off Jun 2022 | 838 Shrader St | unit a: remodel existing full bathroom in kind. noi new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
unit a: remodel existing full bathroom in kind. noi new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $8,000 |
| Dec 20, 2021 | Completed final sign-off Feb 2022 | 272 Oneida Av | add one bathroom on ground fl.Details
add one bathroom on ground fl. | $3,000 |
| Dec 16, 2019 | Completed final sign-off Jun 2021 | 1580 Noriega St | convert (e) commercial space @ 2nd fl to 3 new dwelling units, each new unit included kitchen, living, bedrooms & bathrooms. all new units within (e) building footprint. add sprinkler system at new units and egress per fs-05Details
convert (e) commercial space @ 2nd fl to 3 new dwelling units, each new unit included kitchen, living, bedrooms & bathrooms. all new units within (e) building footprint. add sprinkler system at new units and egress per fs-05 | $150,000 |
| May 31, 2016 | Completed final sign-off May 2018 | 2935 Pacheco St | 1/f: remodel downtstairs bathroom. replace bath tub and toilet. patch tiles as needed and replace sink.Details
1/f: remodel downtstairs bathroom. replace bath tub and toilet. patch tiles as needed and replace sink. | $1,000 |
| Mar 25, 2013 | Completed final sign-off Jul 2013 | 710 32nd Av | add full bathroom, bedroom,storage & replace (e) window to new @ ground floor. remodel (e) kitchen, bathrooms in kind, remove (e) partition walls near the kitchen @ 2nd floor.Details
add full bathroom, bedroom,storage & replace (e) window to new @ ground floor. remodel (e) kitchen, bathrooms in kind, remove (e) partition walls near the kitchen @ 2nd floor. | $9,000 |