Back to bathroom remodel contractors
K H Construction
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to Feb 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 46 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2011 | Completed final sign-off Jul 2012 | 2046 32nd Av | comply w/nov 201131881 - legalize (e) bathroom & bedroom @ ground floor - new shower stall & replace fixtures including elect work. install 1-hr wall & ceiling @ ground floor & metal strap to (e) water heater. remodel bath & kit. @ 2nd. flr.Details
comply w/nov 201131881 - legalize (e) bathroom & bedroom @ ground floor - new shower stall & replace fixtures including elect work. install 1-hr wall & ceiling @ ground floor & metal strap to (e) water heater. remodel bath & kit. @ 2nd. flr. | $6,000 |