Back to bathroom remodel contractors
K C Engineering Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Oct 2011
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 7 never finaled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 never finaled. Typically 8 days from filing to permit and 374 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2011 | Never finaled issued Sep 2011, no final | 1936 Ocean Av | bathroom tile (36 sq ft). repair electrical outlets, lights (repair only no new switches and recepticles). water heater install.Details
bathroom tile (36 sq ft). repair electrical outlets, lights (repair only no new switches and recepticles). water heater install. | $2,000 |
| Aug 17, 2011 | Never finaled issued Aug 2011, no final | 1003 Shotwell St | replace new kitchen cabinets, counter top, floor tile, bathrooms floor tile, portion of new sheetrock, repair broken doors, windows, walls and exhuast fan, repair electrical outlets, heats.Details
replace new kitchen cabinets, counter top, floor tile, bathrooms floor tile, portion of new sheetrock, repair broken doors, windows, walls and exhuast fan, repair electrical outlets, heats. | $4,000 |
| Feb 28, 2011 | Never finaled issued Mar 2011, no final | 37 Edna St | add 3 bedrooms. 1 full bathroom on the first/garage floorDetails
add 3 bedrooms. 1 full bathroom on the first/garage floor | $20,000 |
| Apr 14, 2010 | Completed final sign-off Apr 2011 | 5570 Mission St | unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocksDetails
unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocks | $5,000 |
| Mar 8, 2010 | Completed final sign-off Jan 2012 | 7 Leroy Pl | basement addition: add 3-bedrooms, 2-bathrooms, one storage. stairway connect to 1 flr. of unit #15. remove portion wall @ kitchen & livig room.Details
basement addition: add 3-bedrooms, 2-bathrooms, one storage. stairway connect to 1 flr. of unit #15. remove portion wall @ kitchen & livig room. | $60,000 |