Back to bathroom remodel contractors
K And D Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2024
- Last 24 months
- 1 permit filed
62 permits since 2000: 57 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 16 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2022 | Completed final sign-off Apr 2023 | 2415 Van Ness Av | kitchen and bath remodel in kind. change walk-in close to home office.Details
kitchen and bath remodel in kind. change walk-in close to home office. | $100,000 |
| Oct 9, 2019 | Completed final sign-off Oct 2020 | 751 32nd Av | interior remodel of 2nd floor. remodeling (e) bathrooms add bath tub & relocate (e) kitchen. repair/replace drywall as neededDetails
interior remodel of 2nd floor. remodeling (e) bathrooms add bath tub & relocate (e) kitchen. repair/replace drywall as needed | $46,000 |
| May 10, 2016 | Completed final sign-off Oct 2019 | 601 Connecticut St | remodel of extg single family with new windows, doors, kitchen, structural and bathrooms.Details
remodel of extg single family with new windows, doors, kitchen, structural and bathrooms. | $290,000 |
| Apr 19, 2016 | Completed final sign-off Apr 2017 | 117 Clifford Tr | partial renovation of basement into a new study room & bathroom. existing parking in garage shall remain. no other work in the building except enlarged window at new study room on front facade.Details
partial renovation of basement into a new study room & bathroom. existing parking in garage shall remain. no other work in the building except enlarged window at new study room on front facade. | $43,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2015 | 553 05th Av | move 3rd floor one bedroom unit to first floor. remodel 2nd and 3rd floor to become 3 bedrooms and 2 1/2 bathrooms. replace windows and siding at the rear. provide stair to existing 2nd floor.Details
move 3rd floor one bedroom unit to first floor. remodel 2nd and 3rd floor to become 3 bedrooms and 2 1/2 bathrooms. replace windows and siding at the rear. provide stair to existing 2nd floor. | $175,000 |
| Jan 11, 2013 | Completed final sign-off May 2013 | 315 Naples St | add 1 bedroom, 1 home office, 1 bath and family room at ground floorDetails
add 1 bedroom, 1 home office, 1 bath and family room at ground floor | $25,000 |
| Sep 15, 2010 | Completed final sign-off Oct 2011 | 267 28th Av | remodel master bath and master closet on 2nd fl. no changes to building envelopeDetails
remodel master bath and master closet on 2nd fl. no changes to building envelope | $40,000 |
| Dec 9, 2009 | Completed final sign-off Apr 2010 | 230 Mateo St | revision to application 200910239713. 3rd. floor; add new 2x rafters @ 16" o.c. to (e). add r-13 wall insulation & r-30 attic insulation. provide (n) 5/8" type "x" gyp. bd. for all walls & ceiling. install (n) plumbing fixtures in (e) bathroom.Details
revision to application 200910239713. 3rd. floor; add new 2x rafters @ 16" o.c. to (e). add r-13 wall insulation & r-30 attic insulation. provide (n) 5/8" type "x" gyp. bd. for all walls & ceiling. install (n) plumbing fixtures in (e) bathroom. | $8,000 |
| Jul 23, 2009 | Completed final sign-off Dec 2009 | 2448 Clay St | construction of partition walls on 1st. flr.; window replacement; remodel (2) bathrooms, playroom; upgrade electrical & mechanical ref. appl. #2009/0423/6968.Details
construction of partition walls on 1st. flr.; window replacement; remodel (2) bathrooms, playroom; upgrade electrical & mechanical ref. appl. #2009/0423/6968. | $45,000 |
| Mar 13, 2007 | Completed final sign-off Apr 2007 | 514 Cayuga Av | extg bathroom shower room retileDetails
extg bathroom shower room retile | $4,000 |
| Feb 18, 2003 | Completed final sign-off Apr 2005 | 764 Pacheco St | horizontal 2 story expansion to rear of property.add 1 bathroom & 1 bedroom on 2/f,renovate garage,Details
horizontal 2 story expansion to rear of property.add 1 bathroom & 1 bedroom on 2/f,renovate garage, | $80,000 |
| Aug 30, 2002 | Completed final sign-off Mar 2003 | 100 Eastwood Dr | remodel exist kitchen, remodel one bathroom and add one bathroom. repair stairs add dryrot at garageDetails
remodel exist kitchen, remodel one bathroom and add one bathroom. repair stairs add dryrot at garage | $50,000 |
| Mar 22, 2002 | Completed final sign-off Aug 2002 | 467 Moscow St | exist kitchen and bathroom remodeling.Details
exist kitchen and bathroom remodeling. | $15,000 |
| Jul 30, 2001 | Completed final sign-off Sep 2002 | 938 Goettingen St | add room, construct full bath at basement, upgrade electrical wireDetails
add room, construct full bath at basement, upgrade electrical wire | $18,000 |