Jva 27 Construction
- Based in
- South San Francisco
- On San Francisco permits
- Apr 2024 to Feb 2026
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2026 | In progress issued Aug 2026 | 3221 Market St | legalization of a ground floor unit into an adu through state program. renovation of kitchen and bathroom. new egress window.Details
legalization of a ground floor unit into an adu through state program. renovation of kitchen and bathroom. new egress window. | $20,000 |
| Apr 1, 2024 | In progress issued Sep 2024 | 28 Allen St | altered site permit in conjunction with #201607293726. third floor addition - study, full bath, & guest room. second floor rear expansion. interior stair from second to third floor. replace windows in lightwell w/ fixed windows. convert bedtoom to study @ 1/f.Details
altered site permit in conjunction with #201607293726. third floor addition - study, full bath, & guest room. second floor rear expansion. interior stair from second to third floor. replace windows in lightwell w/ fixed windows. convert bedtoom to study @ 1/f. | $500,000 |