Back to bathroom remodel contractors
Julian Shook
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Oct 2005
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 37 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2005 | Completed final sign-off Dec 2005 | 793 Cole St | partial bathroom remodel, retile shower surround walls, use e terrazzo shower pan, tile floor, new sink, e toilet. install new fireproof side doorDetails
partial bathroom remodel, retile shower surround walls, use e terrazzo shower pan, tile floor, new sink, e toilet. install new fireproof side door | $8,000 |
| May 31, 2005 | Completed final sign-off Jul 2005 | 2009 Golden Gate Av | remodel existing bath. new fixture and fittings, tile tub surround, new linoleum floorDetails
remodel existing bath. new fixture and fittings, tile tub surround, new linoleum floor | $20,000 |
| Apr 27, 2004 | Completed final sign-off Jun 2004 | 696 Edinburgh St | bathroom - retile tub surround, new vanity and top, new fixtures & fittingsDetails
bathroom - retile tub surround, new vanity and top, new fixtures & fittings | $9,800 |