Back to bathroom remodel contractors
Jr General Contractors
- Based in
- S. San Francisco
- On San Francisco permits
- Oct 2009 to Aug 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 8 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2011 | Completed final sign-off Oct 2011 | 1340 Portola Dr | revision to application 201105236533; eliminate window at first floor bathroom (shower area)Details
revision to application 201105236533; eliminate window at first floor bathroom (shower area) | |
| May 23, 2011 | Completed final sign-off Oct 2011 | 1340 Portola Dr | interior remodel of 2 bathrooms,one on each floor. scope includes minimal work at adjacent areas, work includes 4 new windows at side wall and plumbing/elect.Details
interior remodel of 2 bathrooms,one on each floor. scope includes minimal work at adjacent areas, work includes 4 new windows at side wall and plumbing/elect. | $75,000 |
| Oct 12, 2010 | Completed final sign-off Feb 2011 | 1470 26th Av | add 2030 window in new bathroom at lower level. install partition to create an excercise room. enclose with non bearing walls the space below extg second floor sun room.Details
add 2030 window in new bathroom at lower level. install partition to create an excercise room. enclose with non bearing walls the space below extg second floor sun room. | $12,000 |
| Sep 24, 2010 | Completed final sign-off Feb 2011 | 1470 26th Av | remove (e) bathroom, construct new upgraded code compliance full bathrm, remove (e) non struc, drywall partitions and door, install 1 hr wall and door on the first ' garage floorDetails
remove (e) bathroom, construct new upgraded code compliance full bathrm, remove (e) non struc, drywall partitions and door, install 1 hr wall and door on the first ' garage floor | $10,000 |