Back to bathroom remodel contractors
Joseph J Railla
- Based in
- Sebastopol
- On San Francisco permits
- Dec 2010 to Dec 2024
- Last 24 months
- 1 permit filed
99 permits since 2000: 54 completed, 1 in progress, 25 never finaled, 19 expired or cancelled.
Of the 25 never-finaled permits, 9 are 5 to 10 years old, 16 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 3 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2019 | Completed final sign-off Oct 2019 | 507 Potrero Av | kitchen remodel, (2) bathroom remodel (new ceramic tile, plumbing fixtures, electrical, some drywall) size of bath rms 5'x8' (e) kitchen 8'x12' no demolition of wallsDetails
kitchen remodel, (2) bathroom remodel (new ceramic tile, plumbing fixtures, electrical, some drywall) size of bath rms 5'x8' (e) kitchen 8'x12' no demolition of walls | $30,000 |
| Apr 23, 2018 | Completed final sign-off Dec 2018 | 203 Missouri St | rev. to pa 201802090966 to clarify work for unit 2 & unit 3. 205 missouri is incorrect - unit 4, 3rd fl no work; 203 missouri, unit 3 at 2nd fl - kitchen remodel & convert closet to bathroom (work originally filed under pa 2018-0209-0966 under wrong unit; 201 missouri unit 2 at ground fl - kitchenDetails
rev. to pa 201802090966 to clarify work for unit 2 & unit 3. 205 missouri is incorrect - unit 4, 3rd fl no work; 203 missouri, unit 3 at 2nd fl - kitchen remodel & convert closet to bathroom (work originally filed under pa 2018-0209-0966 under wrong unit; 201 missouri unit 2 at ground fl - kitchen | |
| Apr 16, 2018 | Completed final sign-off Apr 2019 | 272 Connecticut St | unit #276 3rd floor: replace kitchen cabinets, replace bathroom plumbing fixtures. replace (4) windows at rear; (3) windows at front. aluminum wood clad, double hung.Details
unit #276 3rd floor: replace kitchen cabinets, replace bathroom plumbing fixtures. replace (4) windows at rear; (3) windows at front. aluminum wood clad, double hung. | $20,000 |
| Mar 7, 2018 | Completed final sign-off Sep 2019 | 41 Ottawa Av | revision to app#201609026792 legalization. relocate kitchen, revamp screen in porch relocate wdw 'c' rearrange extg bathroom and bedroom closet.Details
revision to app#201609026792 legalization. relocate kitchen, revamp screen in porch relocate wdw 'c' rearrange extg bathroom and bedroom closet. | |
| Feb 9, 2018 | Completed final sign-off Dec 2018 | 205 Missouri St | unit #4 on 3rd fl: kitchen remodel, covert closet to bath room. unit #2 on ground fl: kitchen remodel.Details
unit #4 on 3rd fl: kitchen remodel, covert closet to bath room. unit #2 on ground fl: kitchen remodel. | $17,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2018 | 1504 20th St | 3rd flr: unit #3 - remodel kitchen and bathroom. add 3'-0" x 3'-6" window at kitchen . place 5'-0" x 6'-8" opening between kitchen and breakfast room. remodel bedroom closets. work on 3rd floor onlyDetails
3rd flr: unit #3 - remodel kitchen and bathroom. add 3'-0" x 3'-6" window at kitchen . place 5'-0" x 6'-8" opening between kitchen and breakfast room. remodel bedroom closets. work on 3rd floor only | $30,000 |
| Mar 24, 2016 | Never finaled issued May 2021, no final | 717 San Bruno Av | add new garage / basement. add 3rd floor, 1 master bedroom, bath & study. remodel entire house.Details
add new garage / basement. add 3rd floor, 1 master bedroom, bath & study. remodel entire house. | $238,000 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 717 San Bruno Av | revision to pa 2015-0703-0648. replace (e) deck (within existing footprint) existing stair; kitchen remodel & relocate bathroom; new entertainment room on ground floor.Details
revision to pa 2015-0703-0648. replace (e) deck (within existing footprint) existing stair; kitchen remodel & relocate bathroom; new entertainment room on ground floor. | $50,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2018 | 203 Missouri St | replace existing bathroom plumbing fixtures (maintenance within the same bathroom). remove dry rot, maintenance interior in kind.Details
replace existing bathroom plumbing fixtures (maintenance within the same bathroom). remove dry rot, maintenance interior in kind. | $5,000 |
| Oct 30, 2014 | Completed final sign-off Oct 2016 | 203 Missouri St | remodel (e) bathroom. replace (e) tub/shower with shower. unit #201 only. new tile, toilet.Details
remodel (e) bathroom. replace (e) tub/shower with shower. unit #201 only. new tile, toilet. | $3,000 |
| Dec 20, 2013 | Expired or cancelled withdrawn Apr 2015 | 3021 Buchanan St | alteration of upper floor. add top 4th floor & roof garden (new kitchen, mstr bedroom & bath). add exterior rear stairs.Details
alteration of upper floor. add top 4th floor & roof garden (new kitchen, mstr bedroom & bath). add exterior rear stairs. | $200,000 |
| Aug 27, 2013 | Completed final sign-off Jun 2014 | 742 San Bruno Av | replace kitchen and bath cabinets. to comply with cec 150(k) 8 & 10Details
replace kitchen and bath cabinets. to comply with cec 150(k) 8 & 10 | $8,000 |
| Nov 28, 2012 | Never finaled issued Dec 2012, no final | 3063 Washington St | remodel interior only, including kitchen. add (witin existing floor area), new master bathroom, convert (e) living room to master bedroom, convert (e) bedroom to entertainment room.Details
remodel interior only, including kitchen. add (witin existing floor area), new master bathroom, convert (e) living room to master bedroom, convert (e) bedroom to entertainment room. | $50,000 |