Back to bathroom remodel contractors
Jonathan Tower Const.
- Based in
- Richmond
- On San Francisco permits
- Jul 2011 to Feb 2026
- Last 24 months
- 2 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2026 | Completed final sign-off May 2026 | 1846 20th Av | bathroom located on second floor remodel to include remove bathroom and sink and adding vanity. adding (n) exhaust fan with (n) opening. no wall removal.Details
bathroom located on second floor remodel to include remove bathroom and sink and adding vanity. adding (n) exhaust fan with (n) opening. no wall removal. | $42,000 |
| Feb 3, 2025 | Expired or cancelled cancelled Feb 2026 | 205 Ellsworth St | interior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awningDetails
interior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awning | $33,000 |
| Jan 20, 2016 | Completed final sign-off Apr 2016 | 196 Ripley St | bathroom remodel, replace tub w/shower onlyDetails
bathroom remodel, replace tub w/shower only | $21,000 |