Back to bathroom remodel contractors
Jonathan Boys Const Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Jun 2007
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 32 days from filing to permit and 303 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2006 | Expired or cancelled expired Mar 2007 | 2629 Diamond St | addendum to permit 200507147603 change location of existing bathroom at 2nd floor. repace dbl doors and 2 windows w/3 new windows. replace 2 windows w/3 windows 2nd floor bedroom remodel 1st floor, bathroom, kitchen, dining rm.replace dbl doors w/ 1 windowsDetails
addendum to permit 200507147603 change location of existing bathroom at 2nd floor. repace dbl doors and 2 windows w/3 new windows. replace 2 windows w/3 windows 2nd floor bedroom remodel 1st floor, bathroom, kitchen, dining rm.replace dbl doors w/ 1 windows | $25,000 |
| Oct 29, 2002 | Completed final sign-off Aug 2003 | 1896 Pacific Av | master bath remodel, new shower, new bath tub, new tile, new sheetrockDetails
master bath remodel, new shower, new bath tub, new tile, new sheetrock | $28,000 |