Back to bathroom remodel contractors
John Romaidis Construction
- Based in
- San Rafael
- On San Francisco permits
- Sep 2009 to Jul 2014
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 3 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2013 | Expired or cancelled expired Aug 2026 | 393 Roosevelt Wy | interior remodel of an (e) 3 story single family residence. work on 1/f includes creation of a bedroom suite, bathroom and a new access stair to the second floor, work on the 2/f shall include removal of (e) fireplace at living room, removal of (e) kitchen & create a new kitchen & dining room.Details
interior remodel of an (e) 3 story single family residence. work on 1/f includes creation of a bedroom suite, bathroom and a new access stair to the second floor, work on the 2/f shall include removal of (e) fireplace at living room, removal of (e) kitchen & create a new kitchen & dining room. | $100,000 |
| Apr 11, 2013 | Completed final sign-off Nov 2013 | 1021 Hayes St | re-tile master bath shower, re-tile & new counter tops @ 2nd fl bathroom . replace electrical sub panel. new counter tops @ kitchen & 1st fl powder room, insulate & sheet rock rear attic space.Details
re-tile master bath shower, re-tile & new counter tops @ 2nd fl bathroom . replace electrical sub panel. new counter tops @ kitchen & 1st fl powder room, insulate & sheet rock rear attic space. | $50,000 |
| Dec 31, 2012 | Completed final sign-off Feb 2013 | 1440 Broadway | bathroom remodel in kind new tile floor, vanity, fixtures, lighting shall comply with title 24Details
bathroom remodel in kind new tile floor, vanity, fixtures, lighting shall comply with title 24 | $14,000 |
| Jun 17, 2011 | Expired or cancelled expired Jun 2014 | 75 Folsom St | remodel kitchen, relocate plumbing and electrical,new cabinets. remove non bearing wall between living room and kitchen. new lighting throughout unit, new flooring. remodel bath, new tile, fixtures, cabinets, door and closet in bedroom.Details
remodel kitchen, relocate plumbing and electrical,new cabinets. remove non bearing wall between living room and kitchen. new lighting throughout unit, new flooring. remodel bath, new tile, fixtures, cabinets, door and closet in bedroom. | $88,800 |