Back to bathroom remodel contractors
John J. Leal Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to Jun 2005
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2004 | Completed final sign-off Aug 2004 | 72 Manchester St | install new fixtures in the bathroom sheetrock, tape and paint bathroom. install new shower stall.Details
install new fixtures in the bathroom sheetrock, tape and paint bathroom. install new shower stall. | $8,000 |
| Jan 19, 2000 | Expired or cancelled expired Nov 2001 | 2309 Lincoln Wy | hot mop shower membrane, 4 ply membrane flood coat on top, shower stall 6'x6' in existing bathroomDetails
hot mop shower membrane, 4 ply membrane flood coat on top, shower stall 6'x6' in existing bathroom |